THE RETURN AIR PLENUM MUST
BE PERMANENTLY ENCLOSED.
NEVER USE A DOOR AS A PART OF
THE RETURN AIR PLENUM. THE
FLOOR OR PLATFORM MUST
PROVIDE SOUND PHYSICAL
SUPPORT OF THE FURNACE,
WITHOUT SAGGING, CRACKS,
GAPS, ETC., AROUND THE BASE AS
TO PROVIDE A SEAL BETWEEN
THE SUPPORT AND THE BASE.

FAILURE TO PREVENT PRODUCTS
OF COMBUSTION FROM BEING
CIRCULATED INTO THE LIVING
SPACE CAN CREATE POTENTIALLY
HAZARDOUS CONDITIONS,
INCLUDING CARBON MONOXIDE
POISONING THAT COULD RESULT
IN PERSONAL INJURY OR DEATH.

DO NOT, UNDER ANY
CIRCUMSTANCES, CONNECT
RETURN OR SUPPLY DUCTWORK
TO OR FROM ANY OTHER HEAT
PRODUCING DEVICE SUCH AS A
FIREPLACE INSERT, STOVE, ETC.
DOING SO MAY RESULT IN FIRE,
CARBON MONOXIDE POISONING,
EXPLOSION, PERSONAL INJURY
OR PROPERTY DAMAGE.

BLOWER AND BURNERS MUST
NEVER BE OPERATED WITHOUT
THE BLOWER DOOR IN PLACE.
THIS IS TO PREVENT DRAWING
GAS FUMES (WHICH COULD
CONTAIN HAZARDOUS CARBON
MONOXIDE) INTO THE HOME THAT
COULD RESULT IN PERSONAL
INJURY OR DEATH.

UPFLOW UNITS

1. Set furnace in place and connect the

return duct or return air cabinet to
unit. Make the connection air-tight to
prevent entraining combustion
gases from any adjacent fuel-
burning appliances. Unit return air
may be connected on the sides or
bottom of the return air
compartment.

a. Openings in the side must be cut

out the full width of the knockouts
on the unit. If using side return air,

THE BOTTOM base must be
installed

NOTE:

Where the maximum

airflow is 1800 CFM or more, both
sides or the bottom must be used
for return air.

b. If using bottom return air, place

furnace over return air plenum and
seal furnace bottom to return air
plenum.

A SOLID METAL BASE PLATE, (SEE
TABLE 1) MUST BE IN PLACE
WHEN THE FURNACE IS
INSTALLED WITH SIDE OR REAR
AIR RETURN DUCTS. FAILURE TO
INSTALL A BASE PLATE COULD
CAUSE PRODUCTS OF
COMBUSTION TO BE CIRCULATED
INTO THE LIVING SPACE AND
CREATE POTENTIALLY
HAZARDOUS CONDITIONS,
INCLUDING CARBON MONOXIDE
POISONING OR DEATH.

2. If summer air conditioning is desired,

position the indoor coil on the top of
the unit. Insure that no air can
bypass this coil.

3. Connect the supply air plenum to the

furnace plenum opening.

DOWNFLOW UNITS

THE DOWNFLOW FURNACE
DESIGN IS CERTIFIED FOR
INSTALLATION ON A NON-
COMBUSTIBLE FLOOR. IF
INSTALLED ON A COMBUSTIBLE
FLOOR, USE THE SPECIAL BASE
SPECIFIED ON THE FURNACE
CLEARANCE LABEL. FAILURE TO
INSTALL THE SPECIAL BASE MAY
RESULT IN FIRE, PROPERTY
DAMAGE, PERSONAL INJURY OR
DEATH. THIS SPECIAL BASE IS
SHIPPED FROM THE FACTORY AS
AN ACCESSORY.

1. Position the unit over the supply air

plenum and connect.

a. If installing on a combustible floor

and not using an evaporator
coil box, 

install the special

combustible floor base. 
See Figure 4.

b. If summer air conditioning is

desired, position the indoor coil on
the bottom of the unit. Insure that
no air can bypass this coil.

2. Connect the return air ducting to the

return air opening at the top of the
unit. Make the connection air tight to
prevent entraining combustion
gases from an adjacent fuel-burning
appliance.

HORIZONTAL UNITS

1. Unit can be mounted for left or right

side airflow configuration.

2. Position the unit on adequate

supports or by using support
brackets (see Figure 1) and connect
supply plenum.

3. If summer air conditioning is desired,

position the indoor coil on the supply
air side of the unit. Insure that no air
can bypass this coil.

4. Secure the four angle brackets

shipped with the unit to the return air
opening. See Figure 5. Connect the
return air ducting to the return air
opening at the top of the unit. Make
the connection air tight to prevent
entraining combustion gases from
an adjacent fuel-burning appliance.

NOTE: 

Do not block furnace access

with support rods. Maintain clearances
recommended in Figure 2. Allow
enough space for proper service,
maintenance or replacement of the
heat exchanger and blower assembly.

FIGURE 4

COMBUSTIBLE FLOOR BASE

WARNING

!

WARNING

!

WARNING

!

Содержание (-)GLL Series

Страница 1: ...92 24161 24 09 SUPERSEDES 92 24161 24 08 INSTALLATION INSTRUCTIONS FOR UPFLOW HORIZONTAL GPL AND DOWNFLOW GLL TWO STAGE INDUCED DRAFT GAS FURNACES...

Страница 2: ...furnace ground to electrical panel DC microamp A flame signal hot surface ignition units Correct control voltage Measure and set heat anticipator amperage Air conditioning low voltage wires connected...

Страница 3: ...e cancer or birth defects such as fiberglass insulation lead in brass and combustion products from natural gas All new equipment shipped for sale in California will have labels stating that the produc...

Страница 4: ...RATING PLATE MARKING MEANS FOR PROVIDING OUTDOOR AIR REQUIRED FOR COMBUSTION RETURN AIR TEMPERATURE MAINTAINED BETWEEN 55 F 13 C AND 80 F 27 C AND CLEAN FURNACE DUCT WORK AND COMPONENTS UPON SUBSTANTI...

Страница 5: ...is unit when installed For attic or crawl space installation horizontal furnaces may be installed on combustible wood flooring or by using support brackets See Figure 1 6 IMPORTANT If installing in a...

Страница 6: ...BOTTOM 24 1 2 26 13 16 26 5 8 24 11 32 24 11 32 19 32 9 16 24 7 16 28 1 16 26 5 8 14 3 8 11 1 2 34 1 5 8 DIA 23 15 20 D 7 8 DIA 7 8 DIA 19 32 19 32 3 4 14 3 8 11 1 2 1 1 4 23 17 32 C GAS CONNECTION EL...

Страница 7: ...15 5 8 23 5 8 0 0 0 1 3 6 140 lbs TOP BOTTOM 24 1 2 19 3 4 C A B D LOW VOLTAGE GAS CONNECTION ELECTRIC CONNECTION E 26 5 8 26 13 16 6 3 16 20 3 8 23 3 8 5 8 5 8 3 4 5 8 34 23 3 8 20 3 8 6 3 16 24 7 16...

Страница 8: ...tor coil if used of the entire system should not exceed 0 5 w c Be sure to have adequate space for unit filter IMPORTANT Some high efficiency filters have a greater than normal resistance to air flow...

Страница 9: ...CE AND CREATE POTENTIALLY HAZARDOUS CONDITIONS INCLUDING CARBON MONOXIDE POISONING OR DEATH 2 If summer air conditioning is desired position the indoor coil on the top of the unit Insure that no air c...

Страница 10: ...a closet the door must be closed when making this check of the installation DO NOT reset the overtemperature switch without taking corrective action to assure that an adequate supply of combustion ai...

Страница 11: ...temporary construction outside air may still be required for the furnace to operate and vent properly Outside air openings should be sized the same as for a confined space FIGURE 7 AIR FROM ATTIC CRAW...

Страница 12: ...minimum free area of 1 square inch for each 2000 BTUH of total input rating for all equipment in the enclosure see Figure 8 Here are typical duct sizes FIGURE 8 OUTSIDE AIR USING A HORIZONTAL INLET O...

Страница 13: ...ible construction that carries a U L listing Common venting is allowed with vertical B 1 vent systems and lined masonry chimneys Follow the National Fuel Gas Code ANSI Z223 1 and or the Natural Gas In...

Страница 14: ...ight above the highest connected equipment draft hood or flue collar 3 Must rise 1 4 per foot away from the furnace on horizontal runs and be supported with straps or hangers so it has no sags or dips...

Страница 15: ...remains connected to the common venting system properly vents when tested as outlined above return doors windows exhaust fans fireplace dampers and any other gas burning appliance to their previous co...

Страница 16: ...event undue pressure drop and never smaller than the pipe size to the combination gas valve on the furnace Refer to Table 2 for the recom mended pipe size for natural gas and Table 3 for LP gas pipe s...

Страница 17: ...d to use liquefied petroleum LP gas by replacing the pressure regulator spring with the conversion kit spring This LP kit spring allows the regulator to maintain the proper adjusted manifold pressure...

Страница 18: ...clockwise to decrease pressure 7 Securely replace the regulator cap for high fire 8 Operate the furnace in low speed 9 Note or adjust the manifold pressure to give A 1 7 w c for natural gas low fire B...

Страница 19: ...aking the pressure adjustment TO CHANGE ORIFICE SPUDS 1 Shut off the manual main gas valve and remove the gas manifold 2 Replace the orifice spuds 3 Reassemble in reverse order 4 Turn the gas supply b...

Страница 20: ...l Electric Code ANSI NFPA No 70 latest edition or Canadian Electrical Code Part 1 CSA Standard C22 1 and local building codes This can be obtained from National Fire Protection Association Batterymarc...

Страница 21: ...eaner whenever the circulating air blower is in operation RXGW B01 CHIMNEY ADAPTER This appliance is CSA certified for use with RXGW B01 chimney adapter Refer to Kit Installation Instructions 92 10168...

Страница 22: ...TO BE CHANGED THE FOLLOWING EXAMPLES SHOW HOW TO DETERMINE IF AN ORIFICE CHANGE WILL BE NECESSARY AND HOW TO DETERMINE THE NEW ORIFICE SIZE IN CANADA AS AN ALTERNATE TO ADJUSTING THE BURNER ORIFICE SI...

Страница 23: ...YSTEMS Furnace installation with Rheem Ruud ARA or ARL outdoor condensing units can provide high efficiency up to 16 SEER cooling operation Using Tables 9 and 10 and literature provided with the cooli...

Страница 24: ...8 48 25 000 24 000 23 000 22 000 21 000 20 000 19 000 18 000 17 000 16 000 All calculations are performed by using the first three columns of information only Before beginning any calculations determi...

Страница 25: ...thermostat connections since low speed cooling is not wired to the same control board as all other thermostat terminals UP TO 16 SEER COOLING OPERATION SINGLE STAGE COOLING All IFC part numbers and re...

Страница 26: ...ttings Sequence if the system doesn t light or doesn t sense flame a If flame is not sensed within 8 seconds after the gas valve opens the valve closes and the ignitor is de energized The induced draf...

Страница 27: ...d voltage variations The installer is given the option of three air flow options in the heating mode as shown in Table 12 Switches 1 and 2 on the interface control regulate the steady state heating mo...

Страница 28: ...inputs The B terminal input is provided for heat pump applications This signal comes from a heat pump thermostat and tells the heat pump to switch its reversing valve to TABLE 14 COOLING AIR FLOW SWI...

Страница 29: ...29 FIGURE 23 COOLING HEAT PUMP OFF DELAY PROFILES ST A0827 01...

Страница 30: ...30 FIGURE 24 COOLING HEAT PUMP ON DELAY PROFILES ST A0828 01...

Страница 31: ...31 FIGURE 25 LOW HEAT OFF DELAY PROFILES ST A0829 01...

Страница 32: ...32 FIGURE 26 HIGH HEAT OFF DELAY PROFILES ST A0830 01...

Страница 33: ...ne from the heat exchanger See Figure 27 2 Insert a thermometer in the return air duct as close to the furnace as possible 3 Operate the furnace 4 When the thermometer in the supply air duct stops ris...

Страница 34: ...wer wheel E Wrong motor rotation F Blower wheel slipping on the motor shaft 6 Overfiring the furnace with too much gas pressure 7 Ventilation problems FLAME ROLL OUT SAFETY SWITCHES Furnaces are equip...

Страница 35: ...tch is located in the upper position on the furnace LUBRICATION The blower motor and induced draft motor are permanently lubricated by the manufacturer and do not require further attention The motor m...

Страница 36: ...s are used in the system it is important that the airflow is not reduced to maximize system performance and life Always verify that the system s airflow is not impaired by the filtering system that ha...

Страница 37: ...37 FIGURE 32 FILTER RETAINING RODS SIDE RETURN FIGURE 33 DOWNFLOW FILTER INSTALLATION...

Страница 38: ...DS PLACEMENT OF COMBUSTIBLE MATERIALS ON AGAINST OR AROUND THE FURNACE JACKET CAN CAUSE AN EXPLOSION OR FIRE RESULTING IN PROPERTY DAMAGE PERSONAL INJURY OR DEATH THE FURNACE OWNER SHOULD BE CAUTIONED...

Страница 39: ...39 FIGURE 34 INTEGRATED FURNACE CONTROL IFC TROUBLESHOOTING GUIDE FOR UTEC 1095 101...

Страница 40: ...40...

Страница 41: ...41 FIGURE 35 FOR MODELS WITH UT ELECTRONIC CONTROLS 1095 101 INTEGRATED FURNACE CONTROL AND ECM BLOWER MOTOR...

Страница 42: ...42...

Страница 43: ...43...

Страница 44: ...44 CM 1105...

Отзывы: