Step 1 

 

Step 2 

 

 

 

Check that you have the correct components as 
shown in the package contents, including any fixings. 
Note: Your pergola can be shorter than standard by 
removing the appropriate amount from the bottom 
of each post.  

 

Now lay out the 4 posts and 2 runners in the area 
where the pergola is to stand as shown. Try to space 
the feet of the posts apart by approximately the 
length of one rafter. 

Step 3 

 

Step 4 

 

 

 

Slide the runner into the post, making sure the pre-
drilled hole is uppermost ,the slots in the post and 
runner are perfectly aligned and that the post is at 
90° to the runner. Secure the post in place with an 
65mm screw. 

 

Now add the brace, butting it up against the post and 
runner as shown... 

 

 

Содержание Premium Pergola

Страница 1: ...urface if possible with sufficient space You will also require the assistance of up to 2 adults to complete assembly safely Please note For a free standing pergola you can remove up to 600mm from the bottom of each post prior to commencing construction Package contents Tools required Items Quantities in brackets are for 6 post version 4 x Corner posts 2 x Intermediate posts 2 x Runners 6 x Rafters...

Страница 2: ...emoving the appropriate amount from the bottom of each post Now lay out the 4 posts and 2 runners in the area where the pergola is to stand as shown Try to space the feet of the posts apart by approximately the length of one rafter Step 3 Step 4 Slide the runner into the post making sure the pre drilled hole is uppermost the slots in the post and runner are perfectly aligned and that the post is a...

Страница 3: ...r and centrally on the post before securing into place with a 100mm coach screw at each end of the brace Step 7 Step 8 Repeat steps 4 7 for the remaining 3 posts For a six post version line up the intermediate post with the mid point pencil lines on the runner slot into place ensuring it is at 90 to the runner and fix in place with 2 x 65mm screws Attach a brace either side of the post as before R...

Страница 4: ...n into the slots at each end of the posts runners adjusting the positioning of the frames if necessary If the joint is tight you can use a mallet or hammer with wood block to gently tap the rafter down into place Step 11 Step 12 Add the second rafter to the other end of the frames in the same fashion as before Now add the Pedestal panels to the bottom of each post as shown Line up each panel on th...

Страница 5: ...o 7670072 VAT No 151744027 5 Step 13 Step 14 Secure each corner with a 200m coach screw down through the rafter and runner into the post Add the remaining 4 braces using the same method as before Step 15 Step 16 aligning them again the post and underside of the rafter and fixing in place with a 100mm coach screw at each end of the brace ...

Страница 6: ...the assembly is complete Step 19 Step 20 Secure each rafter with a 120mm coach screw down through the rafter into the runner at each end Your Rutland Premium Pergola is now complete We hope that you found your product quick and easy to assemble but if not and you require any further assistance or have any questions you can contact us by telephone on 01778 440803 Email info rutlandcountygardenfurni...

Отзывы: