Rutland Pergola
Rutland County Garden Furniture Ltd, Ashbourne House, 2 Dovecote Meadows,
Aslackby, Sleaford, Lincs, NG34 0HZ.
Company No: 7670072 VAT No: 151744027
3
Step 5
Step 6
Using your assistants, lay out the two frames
assembled in the previous steps, facing each other as
shown above so that they are approximately 60cm
less than the length of one rafter apart.
Get one of the rafters ready to be slotted in place and
have your assistants support the 2 frames vertically
as shown above.
Step 7
Step 8
Using the step ladder or platform for elevation,
carefully lower the rafter (slot side down) onto the
two frame runners...
...so that the rafter sits on the outside of the post at
both ends as shown. Now repeat this for the other
end of the Pergola so it resembles Step 7.