background image

12

Putting into Operation

Mounting

Attention:

 Work on the 

power supply may only 

be carried out by 

authorized electricians! 

Danger for life! Discon-

nect the main voltage 

at first for all mounting 

works. 

Pay attention to the actual 

norms, in order to fulfil the 

general safety requirements for 

telecommunication systems 

and to avoid disturbing inter-

ferences.

Pay attention to the shock-

proof protection of the heavy-

current part in combined 

plants. The shock-proof pro-

tection must also be guaran-

teed, when you have removed 

the common covering (this is 

not always given for old instal-

lations). 

Take care that the minimum 

distance of 10 mm between 

data-/telecommunication ca-

bles and heavy-current cables 

are strictly observed during the 

erection of combined plants.

Working in existing data net-

works requires – if necessary 

– the assent of the respective 

person in charge of network 

and data as well as a prece-

ding data security.

Please also observe the per-

mitted operating temperature, 

do not place the PPR 6 PoE 

and the SVR 48 V PoE directly 

beside devices with high heat 

evolution (e.g. dimmer).

Attention:

This SVR 48 V PoE is intended 

only for an upright mounting!

The mounting is carried out as 

follows:

1  Snap the PPR 6 PoE on 

the DIN rail.

2  Disconnect the screws 

from the device’s lid and 

remove the lid.

3  After installation put the lid 

on and screw it on.

Содержание 235 103 00

Страница 1: ...PoE Patchpanel Midspan 3 PoE Ports PPR 6 PoE und SVR 48 V PoE Bedienungsanleitung Operating Instructions ...

Страница 2: ...2 Entriegelungsknopf release knob Staubschutzkappe dust cover Schraubklemmen unter der Abdeckung screw terminals un derneath the lid Schraubklemmen L N 100 240 V Versorgungsnetz screw terminals L N power supply 100 240 V Schraubklemmen für Instal lationskabel zum PPR 6 PoE screw terminals for installa tion cable to PPR 6 PoE SVR 48 V PoE 235 103 01 ...

Страница 3: ...ting 12 Putting into Operation 12 Installation 13 Technical Data 14 Guarantee 17 Manufacturer s Declaration 17 Table of Contents Allgemeines 4 Montage 6 Inbetriebnahme 6 Installation 7 Technische Daten 8 Garantie 16 Herstellererklärung 16 ...

Страница 4: ... dabei alle notwendigen Ver fahren für ein unkompliziertes Plug and Play der angeschlos senen Endgeräte Das Patchpanel benötigt kei nerlei Bedienelemente für den Benutzer oder Installateur Es ist als Reiheneinbaugerät REG für die Montage in der Elektroverteilung bzw auf der Hutschiene eines Verteilerka stens KVK vorgesehen Um eine Beeinflussung des Netzwerkes durch Störungen oder Veränderungen im ...

Страница 5: ...5 Anwendungsbeispiel Bild 1 ...

Страница 6: ...b deckung entfernt haben dies ist bei Altanlagen nicht immer gegeben Achten Sie bei der Errichtung kombinierter Anlagen auf die Einhaltung der Mindestab stände von 10 mm zwischen Daten Fernmeldeleitungen und Starkstromleitungen Arbeiten an bestehenden Da tennetzen bedürfen ggf der Zustimmung der jeweiligen Netzwerk Datenbeauftragten sowie einer vorhergehenden Datensicherung Beachten Sie bitte auch...

Страница 7: ...knopf oberhalb der entsprechen den Buchse und ziehen dann den Stecker heraus s Bild 3 Bild 2 SVR48VPoE 1 Schließen Sie die SVR 48 V PoE an das PPR 6 PoE an indem Sie nach Öffnen des Gehäu ses die Anschlussklem men Uaus und durch ein Installationskabel mit und des PPR 6 PoE verbinden 2 Schließen Sie die Klem men L und N an das Versorgungsnetz an Die grüne LED leuchtet bei angeschlossener Netzver so...

Страница 8: ...m 6 TE 300 g lichtgrau ähnlich RAL 7035 PA 6 Polyamid 5 C bis 45 C IP20 nach DIN EN 60529 II kein PE PPR 6 PoE Abmessungen L x B x H Gewicht Farbe Material Temperaturbereich Betrieb Lager Schutzart Schutzklasse SVR48VPoE Abmessungen L x B x H Gewicht Farbe Material Temperaturbereich Betrieb Schutzart Schutzklasse Technische Daten ...

Страница 9: ...erlustleistung Kurzschlussfestigkeit Leerlauffestigkeit Netzausfallüberbrückung Betriebsanzeige Technische Änderungen vorbehalten 100 bis 240 V AC 50 bis 60 Hz 48 W 0 94 A Strombegrenzung 1 4 A 480 mV ca 2 W im Leerlauf ca 4 W bei Volllast Ja Ja 100 ms bei 0 V Ja LED ...

Страница 10: ...atch panel contains all necessary me thods for an uncomplicated plug and play of the con nected data terminals The patch panel does not re quire any operating elements for the user or installer It is designed as DIN rail com ponent for the mounting in an electrical distribution respec tively on the DIN rail of a distri bution box In order to avoid an inter ference of the network by disturbances al...

Страница 11: ...11 Application Sample Figure 1 ...

Страница 12: ...nstal lations Take care that the minimum distance of 10 mm between data telecommunication ca bles and heavy current cables are strictly observed during the erection of combined plants Working in existing data net works requires if necessary the assent of the respective person in charge of network and data as well as a prece ding data security Please also observe the per mitted operating temperatur...

Страница 13: ... tive port at first and then extract the plug from the outlet s fig 3 Figure 2 SVR48VPoE 1 To install the SVR 48 V PoE to the PPR 6 PoE connect the terminal Uaus and by an installation cable with and of the PPR 6 PoE after opening the housing 2 Connect the 230 V supply at the screw terminals L and N The green LED lights up when the 230 V supply is connected 5 We recommend a sepa rate circuit break...

Страница 14: ...PoE Dimensions l x w x h Weight Color Material Temperature Operation Storage Protection class 108 x 85 x 56 mm 6 TE 190 g light grey similar RAL 7035 ABS 5 C to 45 C 25 C to 70 C IP20 according to EN 60529 II 108 x 95 x 56 mm 6 TE 300 g light grey similar RAL 7035 PA 6 Polyamide 5 C to 45 C 25 C to 70 C IP20 according to EN 60529 ...

Страница 15: ...pple voltage Power consumption Short circuit proof Open circuit proof Power failure bypass Operation indication II no PE 100 to 240 V AC 50 to 60 Hz 48 W 0 94 Amps voltage limitation at about 1 4 Amps 480 mV about 2 W without load about 4 W with full load yes yes 100 ms at 0 V yes LED ...

Страница 16: ...en senden Sie die Geräte bitte an die fol gende Anschrift Rutenbeck Service Center Gewerbegebiet Im Meilesfelde 5 99819 Marksuhl Wir die Wilhelm Rutenbeck GmbH Co KG erklären dass das PPR 6 PoE und die SVR 48 V PoE gemäß eines von der Benannten Stelle Nr 0682 zertifizierten umfassenden Qualitätssicherungssystems nach Anhang V der Richtlinie 1999 5 EG hergestellt wurde und sich in Übereinstimmung m...

Страница 17: ... EC The complete declaration of conformity can be found under www rutenbeck de in the download sector Manufacturer s Declaration Guarantee We guarantee the perfect function of the PPR 6 PoE and the SVR 48 V PoE for 2 years after date of purchase receipt assuming that they were professionally installed and operated In case of malfunction consult the expert who installed the devices For repairs plea...

Страница 18: ...halksmühle Germany Phone 49 2355 82 0 Fax 49 2355 82 105 www rutenbeck de mail rutenbeck de Wilhelm Rutenbeck GmbH Co KG 2008 Technische Änderungen vorbehalten Sub jected to technical changes 293 615 10241301 Stand Status 02 12 ...

Отзывы: