12
Putting into Operation
Mounting
Attention:
Work on the
power supply may only
be carried out by
authorized electricians!
Danger for life! Discon-
nect the main voltage
at first for all mounting
works.
Pay attention to the actual
norms, in order to fulfil the
general safety requirements for
telecommunication systems
and to avoid disturbing inter-
ferences.
Pay attention to the shock-
proof protection of the heavy-
current part in combined
plants. The shock-proof pro-
tection must also be guaran-
teed, when you have removed
the common covering (this is
not always given for old instal-
lations).
Take care that the minimum
distance of 10 mm between
data-/telecommunication ca-
bles and heavy-current cables
are strictly observed during the
erection of combined plants.
Working in existing data net-
works requires – if necessary
– the assent of the respective
person in charge of network
and data as well as a prece-
ding data security.
Please also observe the per-
mitted operating temperature,
do not place the PPR 6 PoE
and the SVR 48 V PoE directly
beside devices with high heat
evolution (e.g. dimmer).
Attention:
This SVR 48 V PoE is intended
only for an upright mounting!
The mounting is carried out as
follows:
1 Snap the PPR 6 PoE on
the DIN rail.
2 Disconnect the screws
from the device’s lid and
remove the lid.
3 After installation put the lid
on and screw it on.
Содержание 235 103 00
Страница 5: ...5 Anwendungsbeispiel Bild 1 ...
Страница 11: ...11 Application Sample Figure 1 ...