13
Installation
Figure 3
PPR 6 PoE
1 Plug the patch panel in the
RJ45 ports on the front
face and connect them
with the active network
components
(s. fig. 2).
2 For the disconnection of
the patch panel from the
terminals press the release
knob above of the respec-
tive port at first and then
extract the plug from the
outlet (s. fig. 3).
Figure 2
SVR 48 V PoE
1 To install the SVR 48 V PoE
to the PPR 6 PoE, connect
the terminal U
aus
(+ and
-) by an installation cable
with ”+” and ”-” of the
PPR 6 PoE after opening
the housing.
2 Connect the 230 V-supply
at the screw terminals L
and N. The green LED
lights up when the 230 V-
supply is connected.
5 We recommend a sepa-
rate circuit breaker for the
power supply in the elec-
trical distribution box.
Содержание 235 103 00
Страница 5: ...5 Anwendungsbeispiel Bild 1 ...
Страница 11: ...11 Application Sample Figure 1 ...