S7800 Series Hardware Installation Guide Chapter 4 Switch Installation
26
n
After installing the equipment, verify if the front/back cabinet doors can be closed.
n
Verify that the cabinet has been fastened completely, and does not move or tilt.
n
Verify that the equipment has been installed in the cabinet, and all the cables have
been fastened to the cabinet.
4.13.2
Verifying the Cables
n
Verify that the fibers and twisted pairs match the ports.
n
Verify that the cables have been bound properly.
4.13.3
Verifying the Power Supply
n
Verify that the power cables are in good contact and comply with the safety
requirements.
n
Verify that the power module has been fastened onto the equipment with the two
screws on the panel.
n
Turn on the power switch and verify that the power module can work normally.
Содержание RG-S7800 Series
Страница 1: ...Hardware Installation Guide RG S7800 Series High density Multi service IPv6 Core Routing Switch...
Страница 2: ......
Страница 4: ......