S7800 Series Hardware Installation Guide Chapter 4 Switch Installation
20
n
The related network cables have already been deployed at the installation location.
n
Rated power supply is selected.
4.3
Cabinet Installation
4.3.1
Precautions
When you install the cabinet, pay attention to the following:
n
All expansion bolts for fastening the cabinet base to the ground should be installed and
tightened in sequence from bottom up (large plain washer, spring washer, and nut), and
the installation holes on the base and the expansion bolts should be well aligned.
n
After the cabinet is installed, it should be stable and still.
n
After the cabinet is installed, it should be vertical to the ground.
n
When multiple cabinets are put side by side in the room, they should be aligned in a
straight line, with an error less than 5 mm.
n
The front/back doors of the cabinet should be properly installed. You can open and
close them smoothly. The locks should work normally, and all keys should be complete.
n
There should be no unnecessary formal labels inside the cabinet and on various
boards.
n
Blank panels should be installed completely.
n
Fastening screws of various devices in the cabinet of the same model should be ready
and tightened.
n
Various boards of the equipment should be installed securely, and the fastening screws
on the panel should be tightened.
n
All wiring inlets at the top and bottom of the cabinet should be installed with
rodent-resistant nets where the seams should be no more than 1.5 cm in diameter, to
prevent rodents and other small animals from entering the cabinet.
n
Antistatic wrist straps should be provided in the cabinet.
4.3.2
Simple Installation Steps
1. Plan the available space before installing the cabinet. You must reserve sufficient space
for front and back doors for maintenance.
2. Mount and fasten the 19inch cabinet at the designed location as planned.
3. Install the appropriate chute and cables.
4. Install the tray and wiring layer on the rack according to the configuration of one rack
with one cabinet installed or one rack with multiple cabinets installed.
4.4
Mounting into the Cabinet
4.4.1
Precautions
Before mounting RG-S7800 into the cabinet, first verify that the front and back brackets of
the cabinet are at the right locations. If the bracket is too far forward, the front panel of the
equipment may be too close to the front door, so that the front door cannot be closed when
network cables and pigtail fibers are connected. Usually, you should reserve at least 10mm
between the front panel of the equipment and that of the cabinet after installation.
Before mounting the RG-S7800 into a cabinet, you need to address the following conditions: