background image

Hardware Installation and Reference Guide 

 

Preparing for Installation 

 

2  Preparing for Installation 

 

To prevent device damage and physical injury, please read the safety recommendations carefully as described in this 

chapter.   

 

Suggestions do not cover all possible hazardous situations. 

2.1  Lightning Protection   

 

When the connection cable between the main grounding conductor and local equipotential earthing terminal board 

(LEB) on each floor is shorter than 2 meters, use a stranded copper wire with a sectional area not less than 1.318 

mm

2

 (16 AWG) for the connection cable. 

 

Use a shielded network cable if possible, ensure that devices connected to both ends of the shielded network cable 

are reliably grounded, and make sure that the sheath of the shielded network cable is also grounded if possible. If no 

shielded network cable is available, wire the network cable through a steel pipe and bury the steel pipe for lead-in, 

and properly ground both ends of the steel pipe. 

 

No additional lightning protector is  required as a high-profile lightning protector is built in the  RG-EST350 and the 

antenna port and power port support 4kV lightning protection. If a lightning protector of a higher profile is available, 

configure  the  lightning  protector  optionally.  Before  the  configuration,  connect  the  lightning  protector  to  the  ground 

cable. 

2.2  Installation Site   

 

Do not expose the device to high temperature, dust, or harmful gases.   

 

Do not install the device in an area prone to fire or explosions. 

 

Keep the device away from EMI sources such as large radar stations, radio stations, and substations.   

 

Do not subject the device to unstable voltage, vibration, and noises.   

 

Keep the device at least 500 meters away from the ocean and do not face it towards the sea breeze.   

 

The installation site should be protected from water and flooding, seepage, dripping, or condensation.   

 

The  installation  site  should  be  selected  according  to  network  planning,  communications  equipment  features  and 

considerations such as climate, hydrology, geology, earthquake, electric power, and transportation.   

2.2.1  Temperature and Humidity   

To ensure the normal operation and equipment service life, maintain appropriate temperature and humidity levels in the 

equipment room. See Table 2-1. 

Table 2-1 Temperature and Humidity Requirement 

Working Temperature 

-30°C to 65°C (-22°F to 149°F) 

Working Humidity 

5% to 95% (non-condensing) 

Содержание RG-EST350 Series

Страница 1: ...Ruijie RG EST350 Series Wireless Bridges Hardware Installation and Reference Guide V1 00...

Страница 2: ...or by any means without the prior written consent of Ruijie Networks is prohibited Exemption statement This document is provided as is The contents of this document are subject to change without any n...

Страница 3: ...https community ruijienetworks com Technical Support Email service_rj ruijienetworks com Skype service_rj ruijienetworks com Related Documents Documents Description Configuration Guide Describes netwo...

Страница 4: ...hroughput 5GHz 866Mbps Modulation OFDM BPSK 6 9Mbps QPSK 12 18Mbps 16 QAM 24Mbps 64 QAM 48 54Mbps OFDM BPSK QPSK 16QAM 64QAM 254QAM Receive Sensitivity 11a 89dBm 6Mbps 80dBm 24Mbps 76dBm 36Mbps 71dBm...

Страница 5: ...e device is being booted LAN Port Status Solid green The LAN port is not receiving or transmitting data Blinking The LAN port is receiving or transmitting data RSSI 3 LEDs in total STR1 blinking on Th...

Страница 6: ...Hardware Installation and Reference Guide Product Overview 3 Figure 1 2 Bottom View of RG EST350 Ports Figure 1 3 Ports...

Страница 7: ...LAN2 LED c Signal LED STR1 STR2 STR3 2 12 V DC Port 3 LAN2 Port 4 LAN1 PoE Port 5 Reset Button Power Supply RG EST350 adopts 24 V PoE or 12 V DC power supply standard accessory 24 V 0 5A PoE adapter...

Страница 8: ...the antenna port and power port support 4kV lightning protection If a lightning protector of a higher profile is available configure the lightning protector optionally Before the configuration connect...

Страница 9: ...one unit to another Conducted interference often affects the power supply of the device but can be controlled by a filter Radiated interference may affect any signal path in the device and is difficul...

Страница 10: ...power supply Network cables are in place 3 3 Precautions The device can be mounted on a wall and a pole diameter 35 mm to 89 mm If the diameter of the pole is out of the range the hose clamp is custom...

Страница 11: ...the same specification Before connecting the power cord make sure the power switch is in the OFF position Make sure the power supply is properly connected 3 4 Installing Device Wall Mounting connect...

Страница 12: ...plug the other end into the LAN1 PoE port of the device Connect the LAN port of the PoE adaptor to the server or camera Figure 3 3 Recorder End Connection Max distance 100 m CAT 5 6 7 cable Please ins...

Страница 13: ...ximum distance of 100 meters 328 feet 1000BASE T requires all four pairs of wires be connected for data transmission as shown in Figure A 1 Figure A 1 1000BASE T Connection 10BASE T uses Category 3 4...

Страница 14: ...B 1 RG EST350 Parts List No Part Description Qty 1 RG EST350 Recorder 1 2 RG EST350 Camera 1 3 24V 0 5A PoE Power Adapters 2 4 RG EST350 Product Manual 1 5 Phillips Pan Head Screws 8 6 Wall Anchors 6...

Отзывы: