Ruijie RG-EG210G-E Series Routers Hardware Installation and Reference Guide
Preparation before Installation
The grounding device of the router must not be used as the grounding device of the electrical equipment or anti-
lightning grounding device. In addition, the grounding device of the router must be deployed far away from the
grounding device of the electrical equipment and anti-lightning grounding device.
Keep the equipment away from high-power radio transmitter, radar transmitting station, and high-frequency large-
current device.
Measures must be taken to shield static electricity.
2.3 Installation Tool Requirements
Table 2-4 List of Installation Tools
Common Tools
Phillips screwdriver, related copper and fiber cables, bolts, diagonal pliers, cable ties
Special Tools
Wire stripper, crimping pliers, RJ-45 crimping pliers, punch down tool
Meter
Multimeter
The tool kit is customer-supplied.