Ruijie RG-EG Series Routers Hardware Installation and Reference Guide
Preparation
2.2.4 Anti-Interference
The interference as mentioned herein refers to electromagnetic or electrical interference, and the anti-interference
requirements are described below:
Effective power grid interference control measures shall be taken against the power supply system.
The working ground of the router shall be kept far away from the grounding device or lightning grounding device of
power equipment instead of sharing.
The router shall be kept far away from high-power radio-transmitting station, radar-transmitting station and other
high-frequency & heavy-current devices.
Electromagnetic shielding measures shall be taken whenever necessary.
2.2.5 Installation Site
No matter the router is installed in the cabinet or on the workbench, the following requirements shall be met:
Make sure sufficient room has been reserved for the air intake and air vent of router to facilitate the heat elimination
of the router chassis. It is recommended to install the router in the 19-inch standard cabinet. Otherwise, install it on a
clean and flat surface. In heated areas, the air conditioning system shall be equipped.
Make sure the cabinet and workbench is equipped with a good ventilation and cooling system.
Make sure the cabinet and workbench is steady enough and capable of withstanding the weight of the router and its
accessories.
Make sure the cabinet and workbench is properly grounded.
2.3 Installation Tools and Devices
Please prepare the following tools and devices:
Installation
Tools
Phillips screwdriver, ESD wrist strap
Cables
Power cables, configuration cables, Ethernet cables, grounding wires
Devices
HUB or switch, configuration terminal (PC with hyper-terminal), power socket