Ruijie RG-AP180 Series Скачать руководство пользователя страница 10

·

 

Hardware Installation and Reference Guide                                                                                              Preparing for Installation 

 

 

Besides, the contents of salts, acids and sulfides in the air are also strictly limited for the equipment room. These 

substances can accelerate metal corrosion and the aging of some parts. Table 2-3 describes the limit of some hazardous 

gases such as SO

2

, H

2

S, NO

2

 and Cl

in the equipment room.       

Table 2-2 

Gas 

Average (mg/m

3

)   

Maximum (mg/m

3

)   

SO

2

 

0.2   

1.5   

H

2

0.006   

0.03   

NO

2

 

0.04   

0.15   

NH

3

 

0.05   

0.15   

Cl

2

 

0.01   

0.3   

2.5  Power Supply 

 

PoE injector: IEEE 802.3at/af compliant   

 

DC power adapter:   

Input voltage: 12V 

Rated current: 1.0A 

Technical Specifications of the DC Connector 

Inner Diameter 

Outer Diameter 

Insertion Depth 

Polarity 

2.1mm 

5.5mm 

10mm 

Inner pole: positive 

Outer pole: negative 

 

 

The DC input power should be greater than the power actually consumed by the system. The input power for the 

RG-AP180 should not be lower than 10W. 

 

Use DC power adapters with specifications recommended by Ruijie. 

 

Please use Ruijie certified PoE injectors.   

2.6  EMI Consideration 

Various interference sources, from either outside or inside the equipment or application system, affect the system in the 

conductive ways such as capacitive coupling, inductive coupling, and electromagnetic radiation. There are two types of 

electromagnetic  interferences:  radiated  interference  and  conducted  interference,  depending  on  the  type  of  the 

propagation path. When the energy, often RF energy, from a component arrives at a sensitive component via the space, 

Содержание RG-AP180 Series

Страница 1: ...Ruijie RG AP180 Series Access Points Hardware Installation and Reference Guide V1 00...

Страница 2: ...or by any means without the prior written consent of Ruijie Networks is prohibited Exemption statement This document is provided as is The contents of this document are subject to change without any n...

Страница 3: ...ty https community ruijienetworks com Technical Support Email service_rj ruijienetworks com Skype service_rj ruijienetworks com Related Documents Documents Description Configuration Guide Describes ne...

Страница 4: ...with Ruijie RG WS Wireless Controller Series wireless data forwarding high performance security and access control can be accomplished with ease 1 1 Technical Specifications Table 1 1 Technical Specif...

Страница 5: ...l power supply DC 12V 1A PoE IEEE 802 3af 802 3at compliant compatible Power Consumption 10W Bluetooth Bluetooth 4 0 iBeacon Temperature Operating 10 C to 45 C 14 F to 113 F Storage 40 C to 70 C 40 F...

Страница 6: ...Reference Guide Product Overview Figure 1 2 Bottom View of RG AP180 Note 1 Four 10 100 1000Base T LAN ports Figure 1 3 Side View of RG AP180 Note 1 Micro USB management port Console 2 Reset button 3 P...

Страница 7: ...AP is powered off Or the AP is in Silent mode which can be disabled via software Fast blinking green before solid green 2 5Hz fast blinking green Initialization is in progress The AP is operational F...

Страница 8: ...P connection is established At least one client is associated 1 4 Reset Button To reset the AP you need to keep the reset button pressed for 2s or less To restore default settings you need to keep the...

Страница 9: ...should be free from water flooding seepage dripping or condensation The installation site shall be selected according to network planning and features of communications equipment and considerations s...

Страница 10: ...meter Outer Diameter Insertion Depth Polarity 2 1mm 5 5mm 10mm Inner pole positive Outer pole negative The DC input power should be greater than the power actually consumed by the system The input pow...

Страница 11: ...tive measures should be taken for the power system to prevent the interference from the electric grid The working ground of the routers should be properly separated and kept as far as possible from th...

Страница 12: ...all the device in a well ventilated location Do not subject the device to high temperatures Keep away from high voltage cables Install the device indoors Do not expose the device in a thunderstorm or...

Страница 13: ...ype faceplate that is mounted on the wall Skip this step if the faceplate has not been mounted Figure 3 1 Loosen Screws on the Faceplate 2 Connect the uplink cable to the UpLNK port Figure 3 2 Connect...

Страница 14: ...in the way as shown in the following figure Figure 3 4 Install the Cover 5 Compete the installation Figure 3 5 Cover for RG AP180 3 4 Removing the Plate Cover You can use a straight screwdriver to re...

Страница 15: ...Hardware Installation and Reference Guide Installing the Access Point...

Страница 16: ...ommended that you check the following to ensure normal operation of the AP Check if any message is displayed on the Web based configuration interface for the wireless controller Check if the LED works...

Страница 17: ...the Ethernet link is up But the CAPWAP connection is faulty Blinking green 0 4Hz The AP is operational The CAPWAP connection is OK At least one client is associated with the AP Blinking green one flas...

Страница 18: ...cable is connected Verify that the device at the other end of the Ethernet cable is working properly And then verify that the Ethernet cable is capable of providing the required data rate and is prope...

Страница 19: ...imum distance of 100 meters 328 feet 1000BASE T requires all four pairs of wires be connected for data transmission as shown in Figure A 1 Figure A 1 1000BASE T Connection 10BASE T uses Category 3 4 5...

Отзывы: