
·
Chapter 3 Product Installation
RG-WALL1600-S3600 must be used and fixed in the room.
Make sure you have carefully read part 2 and this part, and be sure that the requirements set forth in part 2
have been met.
Installation Procedure
Installation Verification
The RG-WALL1600-S3600 is complicated equipment, so you must carefully plan and arrange the installation location,
networking mode, power supply, and wiring before installation. Verify the following before installation:
The installation location is of a good air flow.
The installation location meets the temperature and humidity requirements of the equipment.
The qualified power supply is available at the installation location.
The related network cables have already been deployed at the installation location.
The selected power supply meets the system power.
Preparation
Install the Cabinet (Optional)
Mount chassis into cabinet (Optional)
Ground the system
Insert various modules
Connect cables or fibers to ports
Bind cables or fibers
Verification
End
Connect power supply