
Hardware Installation and Reference Guide Preparing for Installation
12
2.2.7
Lightning Protection Requirements
The device can guard against lightning strikes. As an electric device, it may still be damaged by strong lightning
strikes. Take the following lightning protection measures:
Ensure that the neutral point of the AC power socket is in good contact with the ground.
You are advised to install a power lightning arrester in front of the power input end to enhance the lightning
prevention for the power supply.
2.2.8
Installation Site Requirements
Regardless of whether the device is installed on the wall or ceiling, the following conditions must be met:
Maintain a minimum clearance of 0.4 cm (15.75 in.) around the device to ensure proper cooling and
ventilation.
The installation site allows for proper cooling and ventilation. You are advised to install an air conditioner if
you want to install the device in a hot area.
The installation side is sturdy enough to support the weight of the device and its accessories.
2.3
Tools
Table 2-3
Tools
Common
Tools
Phillips screwdrivers, wires, Ethernet cable, fastening bolts, diagonal pliers, and binding
straps
Special Tools
Antistatic gloves, wire stripper, crimping pliers, crystal connector crimping pliers, and wire
cutter
Meter
Multimeter, and bit error rate tester (BERT)
Relevant
Devices
PC, display, and keyboard
Note
The device is delivered without a tool kit. The tool kit and cables are customer-supplied.