
·
Chapter 3 Installing the Access Point
The RG-AP520(DA) series must be fixed and installed indoors.
Before installing the AP, make sure you have carefully read the requirements described in Chapter 2.
Installation Flowchart
Before You Begin
Before you install the AP, verify that:
The installation site provides sufficient ventilation for the AP.
The installation site meets temperature and humidity requirements.
The installation site is equipped with proper power supply.
Network cables are in place.
The installation site meets all described requirements.
The custom AP meets the customers
’ requirements.
Precautions
To avoid damages to the AP, observe the following safety precautions:
Do not power the device during installation.
Install the device in a well-ventilated location.
Do not subject the device to high temperatures.
Keep away from high voltage cables.
Install the device indoors.
Do not expose the device in a thunderstorm or strong electric field.
Keep the device clean and dust-free.
Disconnect the device before cleaning it.
Do not wipe the device with a damp cloth.
Содержание RG-AP520(DA) Series
Страница 1: ...RG AP520 DA Series Access Point Hardware Installation and Reference Guide V1 0...
Страница 10: ...Half power beamwidth about 35 Half power beamwidth about 60...
Страница 29: ......