background image

 

Miknetum MGR 400 

a)

 

Visual check for changes or damages on all machine sides 
and accessible machine parts, e.g. steel cables and chain. The 
machine must be shut down in the event of any damages or 
changes! 

b)

 

Check the safety switches as follows: 
– Start the machine. – Press the emergency-stop switch. – If 
the machine has not switched off, it must be shut down 
immediately! 

 
!!! To shut down the machine, the emergency-stop switch must be 
pushed to “Emergency-Stop”, the main switch turned to “0” - OFF" and 
the power plug pulled from the outlet! The machine must be secured 
against further use! 
 
!!! The supervisor must arrange for the repair of the non-functional 
safety device by a Rühle service technician. Until the corresponding 
parts have been repaired, the supervisor must ensure that the 
machine or parts of the machine are under no circumstances put into 
operation! 
 
!!! The cleaning personnel must observe the work procedures from the 
“Cleaning” work instructions prepared by the supervisor. 
 
!!! The maintenance personnel may only carry out work specified as 
“Regular care”, unless any other authorisation has been issued in 
writing by the manufacturer of the machine. The maintenance 
personnel must observe the work procedures from the “Maintenance” 
work instructions prepared by the supervisor. 
The power plug must be disconnected for maintenance work! 
 
!!! The machine may not be modified. 
 
!!! Only Rühle spare parts and accessories may be used. 
 
!!! The operating instructions as well as all other technical documents 
included must be supplied completely when reselling the machine. 

Содержание MGR 400

Страница 1: ...bensmitteltechnik Translation of the original instructions Miknetum Type MGR 400 R hle GmbH Beim Signauer Schachen 10 D 79865 Grafenhausen Tel 49 7748 523 11 Fax 49 7748 523 8511 www original ruehle d...

Страница 2: ...Operating instructions 9 4 Cleaning instructions 11 4 1 Safety instructions 11 4 2 Cleaning agents and disinfectants 13 4 3 Cleaning procedure 13 5 Service Care maintenance repair 14 5 1 Regular care...

Страница 3: ...m the mains during this process Refrigeration installer These work activities may be carried out only by a refrigeration installer Disregard may result in injuries Warning of hot surface Warning of su...

Страница 4: ...tive equipment All life cycles phases Wear foot protection Wear hand protection Wear protective clothing Cleaning care maintenance dismantling Wear eye protection Use light breathing mask Care mainten...

Страница 5: ...ce technician Until the corresponding parts have been repaired the supervisor must ensure that the machine or parts of the machine are under no circumstances put into operation The cleaning personnel...

Страница 6: ...ng aid standard trolley support and reaching into the area of moving parts is strictly prohibited The standard trolleys provided must be used Maintenance The machine must be disconnected from the main...

Страница 7: ...s Installation and commissioning of the machine may only be carried out in the presence of a R hle service technician or by persons authorised by R hle R hle GmbH Lebensmitteltechnik shall not be liab...

Страница 8: ...achine The machine is connected to a three phase current outlet its data voltage amperage must agree with the specifications on the type plate of the machine The machine must be decommissioned until a...

Страница 9: ...h When the drum moves automatically a 5 second starting alert horn sounds If the power fails when a user program is being executed the machine will react as follows when the power supply is reinstated...

Страница 10: ...a recipe the lifting aid must therefore be moved down again When emptying the drum corresponding appropriate precautions must be taken to ensure that no person stands in the discharge area of the mac...

Страница 11: ...ging position so that it can be used for any operating process The control panel may only be operated by touching it with the fingers Using any objects e g blade is prohibited 4 Cleaning instructions...

Страница 12: ...d in the product data sheet of the manufacturer Personal protective equipment must be worn Cleaning with high pressure cleaners is permitted only for all outside surfaces drum drum lid and drum lid se...

Страница 13: ...acidic Disinfectants Tego 2000 Tego IMC Supplier Th Goldschmidt AG Goldschmidtstr 100 D 45116 Essen Tel 49 201 1730 1 4 3 Cleaning procedure Please refer to the short instructions supplied with your m...

Страница 14: ...ain permission from R hle customer service if welding or cutting work is required on the machine Make sure when working on the electrical equipment of the machine that this is only done by qualified p...

Страница 15: ...trolley support h Check the drum lid holder i Check the chain lock for flawless function j Visually check the chain for wear k Visually check the steel cable for fraying 5 2 Regular maintenance Regul...

Страница 16: ...er ready 6 Disposal 1 The machine contains a cooling system filled with the refrigerant R404A It must be pumped off by a refrigeration installer and must then disposed of correctly 2 The following com...

Страница 17: ...eed 25 to 25 rpm Tumbling arm speed 0 to 25 rpm Vacuum 0 95 Lifting aid load capacity 400 kg Emission sound pressure level LpA 70 dB A Measured according to DIN EN ISO 11201 accuracy class 2 Measured...

Страница 18: ...Miknetum MGR 400 18 7 2 Electrical circuit diagram The electrical circuit diagram of your machine is located in the electrical control cabinet and must be supplied when reselling the machine...

Страница 19: ...processing machinery Basic concepts Part 2 Hygiene requirements Hygiene requirements DIN EN 60204 1 2007 06 A1 2009 10 Safety of machinery Electrical equipment of machines Part 1 General requirements...

Отзывы: