Rugged Interactive
Unit 1, Callywith Gate
Callywith Industrial Estate, Bodmin
Cornwall, UK
PL31 2RQ
+44 (0) 1726 981 123
www.rugged-interactive.co.uk
WallRider -
Installation Checklist
© Rugged Interactive
2019
WallRider Installation Checklist
Please complete this checklist after any installation:
Check 1: Pre-power up checks.
Mounted onto a wall of a construction capable of supporting its gameplay.
☐
All fixings are tight and secure.
☐
No signs of damage, component failure and/or missing parts.
☐
No trapped and/or pinched cables.
☐
No loose cables that could become a tripping hazard.
☐
All long cables are supported at least every 50 cm.
☐
Adequate strain relief provided for connection points.
☐
Kept out of direct sunlight during the day.
☐
All electric components away from contact with water.
☐
Protective plastic sheets removed from front graphic panels.
☐
Check 2: Plug into a mains socket and power up.
All targets light up.
☐
Text appears on the hub display and is as expected
.
☐
Sound volume is at a suitable level
*
.
☐
Check 3: Select Beginner via Quick Start.
Program counts down from 3 and begins.
☐
Expected targets become active and operational in sequence.
☐
Sounds can be heard when the targets are hit.
☐
Program plays as described in the Programs Guide.
☐