Section 3 - Installation
© Rugged Interactive
2019
3.4
–
Detailed Installation
Read this manual before installing the WallRider units.
Installation Guidelines:
▪
Complete a
Site Survey
form prior to delivery and/or installation.
▪
Send a completed
Installation Checklist
after any installation back to Rugged Interactive.
▪
A typical installation should take 2 people about 4 hrs.
▪
The wall surface must be flat over the area of the wall.
▪
A suitable electricity supply should be available within 1000 mm (110 - 230V 13A).
▪
Avoid trapped and/or pinched cables.
▪
No obstructions or protrusions in the installation area: e.g. skirting boards, pipes,
cables and wiring conduits.
▪
Minimum required wall height 2m.
▪
A 502mm x 242mm hole (+3 / - 0) will need to be cut from the plywood for each of the
targets to be fitted.
▪
A 502mm x 482mm hole (+3 / - 0) will need to be cut from the plywood for the score box
▪
A minimum of 70mm of space is required behind each target and the scorebox.
▪
Avoid trapped and/or pinched cables.
▪
Use good practice when running data cables to and from products, external pods and
sensors. Support long cables at least every 50 cm and provide adequate strain relief for
connection points.
▪
To prevent electric shock, keep all electric components away from contact with water.
▪
IMPORTANT: Take anti-static precautions.
Structure:
•
The targets must be mounted to a flat/level construction capable of supporting its weight and
gameplay.
•
Mount onto minimum of 18 mm plywood mechanically mounted to a framework.
•
Avoid clashing the uprights with fixing holes.
•
Do not fix to plasterboard faced partition. Avoid stud walls or unsupported portal infills.
Fixings:
•
The manufacturer will supply fixings.
•
All fixings must be tight and secure.