Rugged Interactive
Unit 1, Callywith Court
Callywith Gate Ind. Est.
Bodmin, Cornwall, UK
PL31 2RQ
+44 (0) 1726 981 123
www.rugged-interactive.co.uk
©
Rugged Interactive
2019
Section 2 – Installation
Read this manual before installing the CardioWall Compact units.
Installation Guidelines:
• Complete the Site Survey form prior to delivery and/or installation: https://goo.gl/Rs3n5u
• Please send a completed Installation Checklist after any installation to Rugged Interactive.
• A typical installation should take 2 people about 2 hours.
• No obstructions or protrusions in the installation area: e.g. skirting boards, pipes, cables and wiring
conduits.
• Avoid trapped and/or pinched cables.
• Use good practice when running data cables to and from products, external pods and sensors. Support
long cables at least every 50 cm and provide adequate strain relief for connection points.
• Power supply to be within 1000 mm of each CardioWall. CardioWall should be connected to the mains
power supply by a qualified operative.
• To prevent electric shock, keep all electric components away from contact with water.
• IMPORTANT: Take anti-static precautions.
• The units must be mounted to a flat/level construction capable of supporting its weight and gameplay.
(Uneven walls and surfaces make alignment and fitting very difficult.)
• The wall area for installation will need to exceed the width and height of the CardioWall (refer to Sys-
tem Specifications) plus an additional 10 cm of clear space around each edge. If two CardioWalls are
being positioned side-by-side, leave a gap of 150 cm - 300 cm.
• Typical suitable construction would be block built, portal frame with structural infills or brick built.
• Alternatively, mount onto 18 mm plywood (12 mm minimum) mechanically mounted to a steel frame-
work (50 mm box minimum). Preferably, the plywood should be painted prior to installation.
• Adequate holes will need to be cut during installation to provide clearance for cable access to rear if
required.
• Do not fix to plasterboard faced partition. Avoid stud walls or unsupported portal infills.
Structure:
Section 2
– 1
Fixings:
• The manufacturer will supply fixings.