10
2. Installation
2-1. Starting ES-2410C Up
This section will give users a quick start for:
-
Hardware and Cable Installation
- Management Station Installation
- Software booting and configuration
2-1-1. Hardware and Cable Installation
At the beginning, please do first:
⇒
Wear a grounding device to avoid the damage from electrostatic discharge
•
Installing Optional SFP/GBIC
Fiber Transceivers to the ES-2410C L2 Plus
Managed Switch
Note: If you have no modules, please skip this section.
•
Connecting the SFP/GBIC Module to the Chassis:
The optional SFP/GBIC modules are hot swappable, so you can plug or unplug
it before or after powering on.
1. Verify that the SFP/GBIC module is the right model and conforms to the
chassis
2. Slide the module along the slot. Also be sure that the module is properly
seated against the slot socket/connector
3. Install the media cable for network connection
4. Repeat the above steps, as needed, for each module to be installed into
slot(s)
5. Have the power ON after the above procedures are done
Fig. 2-1 Installation of Optional SFP/GBIC Fiber Transceiver
Содержание ES-2410C
Страница 1: ......
Страница 7: ...Publication date Jan 2009 vii Revision A1 Revision History Release Date Revision 1 15 01 19 2009 A1...
Страница 46: ...Publication date Jan 2009 Revision A1 38 Fig 3 5...
Страница 158: ...Publication date Jan 2009 Revision A1 150 Fig 3 85 Fig 3 86 Fig 3 87...
Страница 171: ...Publication date Jan 2009 163 Revision A1 Fig 4 1...
Страница 282: ...Publication date Jan 2009 Revision A1 274 22 1 0 Disable 23 1 0 Disable 24 1 0 Disable 25 1 0 Disable 26 1 0 Disable...
Страница 289: ...Publication date Jan 2009 281 Revision A1 Note Any specification is subject to change without notice...
Страница 291: ...Publication date Jan 2009 283 Revision A1...