19
Pass the other end of the downhaul control
line through the block which you added to
the downhaul primary in
step a
.
Pass the end of the control through the block on
the starboard organiser.
d)
e)
f)
g)
Tie the tail of the downhaul to the tail of the kicker with
a reef knot.
NOTE:
In order to keep the knot small the core has been removed from the end of both ropes.
3.7a - Rigging the downhaul
Pass the end of the control line through the downhaul
cleat (on the starboard side of the foredeck).
Содержание RS Neo
Страница 1: ...Rigging Manual V1 PLEASE FOLLOW RIGGING MANUAL IN THE CORRECT ORDER ...
Страница 4: ...2 2 Technical Data Length Overall LOA 3 53 m Beam 1 42 m Hull Weight 60 kg Mainsail 6 0 m2 ...
Страница 5: ...3 3 Commissioning PLEASE FOLLOW RIGGING MANUAL IN THE CORRECT ORDER ...
Страница 27: ...25 4 Completion PLEASE FOLLOW RIGGING MANUAL IN THE CORRECT ORDER ...
Страница 29: ...27 5 Sailing Hints PLEASE FOLLOW RIGGING MANUAL IN THE CORRECT ORDER ...
Страница 32: ...30 6 Maintenance PLEASE FOLLOW RIGGING MANUAL IN THE CORRECT ORDER ...
Страница 37: ...35 8 Knots a a b c d e b Knot 1 Knot 1 Knot on knot Knot 2 Bowline Knot 4 Knot 2 Knot 5 Knot 3 Knot 6 ...
Страница 38: ...36 8 Knots a a b b c Knot 3 Figure of eight Knot 4 Overhand knot Knot 6 Cow hitch Knot 5 Double sheet bend ...