16
B
B
A
A
q)
r)
s)
When pulled tight blocks should
be 60mm apart.
Before sailing hoist the sail and make final
adjustments.
You may need to adjust it again after the
rope has stretched.
VANG CONTROL LINE
A
A B
B
C
C
D
D
E
Note: The control line is tapered at one end. This
end will remain in the cockpit. Tie the non-tapered
part to the becket on the boom block with
knot #2
.
This now becomes Part
A
in the illustration.
Thread the vang control line through the blocks as
shown.
E goes through the gooseneck in the next step.
3.7 - Rigging the boom
60mm
60mm
Feed the end of A through the 30mm block and tie the
double block onto the end using
knot #1
.
Содержание RS Neo
Страница 1: ...Rigging Manual V1 PLEASE FOLLOW RIGGING MANUAL IN THE CORRECT ORDER ...
Страница 4: ...2 2 Technical Data Length Overall LOA 3 53 m Beam 1 42 m Hull Weight 60 kg Mainsail 6 0 m2 ...
Страница 5: ...3 3 Commissioning PLEASE FOLLOW RIGGING MANUAL IN THE CORRECT ORDER ...
Страница 27: ...25 4 Completion PLEASE FOLLOW RIGGING MANUAL IN THE CORRECT ORDER ...
Страница 29: ...27 5 Sailing Hints PLEASE FOLLOW RIGGING MANUAL IN THE CORRECT ORDER ...
Страница 32: ...30 6 Maintenance PLEASE FOLLOW RIGGING MANUAL IN THE CORRECT ORDER ...
Страница 37: ...35 8 Knots a a b c d e b Knot 1 Knot 1 Knot on knot Knot 2 Bowline Knot 4 Knot 2 Knot 5 Knot 3 Knot 6 ...
Страница 38: ...36 8 Knots a a b b c Knot 3 Figure of eight Knot 4 Overhand knot Knot 6 Cow hitch Knot 5 Double sheet bend ...