Before assembling, proceed to clean the slab to eliminate all kinds of impurities (sand, twigs, leaves, etc).
The slab should be smooth without irregularities and properly leveled to allow the correct assembly of the pool.
Marking the layout of the pool
IMPORTANT:
The assembly of the pool should be performed after complete drying of the concrete slab (2/3 weeks).
Dimensions shown are interior dimensions.
On the concrete slab perform marking the route of the
pool. With the first marking, you will find the center
point of the concrete slab
(
0)
.
Perform marking of points
A
and
B
separated 2,277m
from the center of the pool
(0).
Repeat to get points 1
and 2 with a distance of 2,166m from the center of the
pool (0).
From points
1
and
2
draw two parallel lines the
A/B
over
the entire length of the concrete slab.
Perform marking of points
3
and
4
distanced 1,574m
from points
A
and
B
respectively.
From the points
3
and
4
draw two parallel lines about
1/2
the entire width of the concrete slab.
Then confirm with the corresponding diagonal
measurement 4,554 m.
With these points, you will obtain the location of the first
pillars.