The Smartwasher™ machine is of a
CLASS 1 construction and due to the
weight of the machine when full should be
classed as stationary. We recommend a
minimum time of 12 months for combined
testing and inspection and monthly for the
formal visual inspection.
Lift the sink and place out of the way,
allowing access to the heater element.
Place the earth clamp of the P.A.T. tester
onto the heater element and take readings
as normal (use the 25amp setting for this
test). The heater effectively earths the fluid
in the base of the machine.
A 500v Insulation test should not be
carried out on this machine due to the
electronic nature of the control circuit
board. This is with reference to the
codes of practice:- Sections 8.1.3b and
15.3b
This test may be carried out in the normal
manner on the differential leakage setting
on the tester. We have found this to be the
most effective.
P.A.T. Testing
Earth Continuity
Earth Leakage
Содержание PCS25 Smartwasher
Страница 10: ......