![ROYALL 6130NS Скачать руководство пользователя страница 13](http://html.mh-extra.com/html/royall/6130ns/6130ns_instruction-manual_1495287013.webp)
September
2012 Page
11
SHROUD INSTALLATION
NOTE:
SHROUDS ORDERED AS A SET
SET
INCLUDES:
4
CORNER
2
SIDES
1
TOP
HARDWARE SHROUDS ARE UNIQUE FOR EACH UNIT.
1. Attach Shroud mount corners to Boiler using supplied hardware.
Each corner is designed to fi t a specifi c corner of the unit.
2. Attach Shroud side panels to corners.
Panels will fi t inside the corners.
3. Install Shroud top.
Top must be installed before aquastat is installed.
Attach with supplied hardware.
S H R O U D M O U N T I N G
C O R N E R
S H R O U D S I D E
S H R O U D T O P