82
Take down the engine
1. Unscrew and remove the engine fixed shaft nut (shown no.43), do not remove the fixed shaft (shown no.43).
2. Reconfirm that the connection of the engine has been removed, remove the fixed shaft (shown no.43), and take down
the engine.
Assemble again
CAUTION
Reassembly according to the above reverse procedure, and tighten to the required torque.
Содержание GP125S
Страница 1: ......
Страница 2: ......
Страница 20: ...19 3 Clutch driving wheel locator Z03 4 Shaft bearing punch Z06 1 Z06 8 5 Oil seal punch Z07 1 Z07 9 ...
Страница 22: ...21 2 General tools No Name Picture 1 T sleeve 8 10 12 14 2 Tool case 1 ...
Страница 23: ...22 3 Tool case 2 4 Spring pliers 5 Screwdriver ...
Страница 24: ...23 6 Pliers 7 Nylon hammer 8 Multimeter ...
Страница 55: ...54 ELECTRICAL SYSTEM Components arrangement ...
Страница 56: ...55 ...
Страница 60: ...59 Harness diagram ...
Страница 61: ...60 Conceptual diagram ...
Страница 69: ...68 ...
Страница 73: ...72 4 Unscrew and remove the 2 screws shown no 9 5 Take down the air filter and front fender ...
Страница 105: ...104 ...
Страница 108: ...107 ...
Страница 110: ...109 2 Use special tool to compress valve spring and take out valve lock clip ...
Страница 123: ...122 EFI SYSTEM The vehicle uses the Magneti Marelli EFI system The schematic diagram as follows ...
Страница 144: ...143 Throttle valve disassembly and installation 1 Remove the fuel tank 2 Disconnect the plug ...
Страница 161: ...160 COOLING SYSTEM System composition ...
Страница 170: ...169 ...