165
FINAL INSPECTION
After Vehicle maintenance, before the normal riding, the following checks shall be carried out.
Appearance check
1. The paint surface of a leaking part
2. Assembly of plastic parts with external leakage
3. Scratch
Tightening torque check
1. Front and Rear suspending device
2. Front and Rear brake calipers, brake discs
3. Front and Rear wheels and wheel shafts
4. Connection between engine and frame
5. Handlebar, steering mechanism
6. Plastic parts fastening
Содержание GP125S
Страница 1: ......
Страница 2: ......
Страница 20: ...19 3 Clutch driving wheel locator Z03 4 Shaft bearing punch Z06 1 Z06 8 5 Oil seal punch Z07 1 Z07 9 ...
Страница 22: ...21 2 General tools No Name Picture 1 T sleeve 8 10 12 14 2 Tool case 1 ...
Страница 23: ...22 3 Tool case 2 4 Spring pliers 5 Screwdriver ...
Страница 24: ...23 6 Pliers 7 Nylon hammer 8 Multimeter ...
Страница 55: ...54 ELECTRICAL SYSTEM Components arrangement ...
Страница 56: ...55 ...
Страница 60: ...59 Harness diagram ...
Страница 61: ...60 Conceptual diagram ...
Страница 69: ...68 ...
Страница 73: ...72 4 Unscrew and remove the 2 screws shown no 9 5 Take down the air filter and front fender ...
Страница 105: ...104 ...
Страница 108: ...107 ...
Страница 110: ...109 2 Use special tool to compress valve spring and take out valve lock clip ...
Страница 123: ...122 EFI SYSTEM The vehicle uses the Magneti Marelli EFI system The schematic diagram as follows ...
Страница 144: ...143 Throttle valve disassembly and installation 1 Remove the fuel tank 2 Disconnect the plug ...
Страница 161: ...160 COOLING SYSTEM System composition ...
Страница 170: ...169 ...