135
3
Remove the spark plug cap, connect the spark plug, let the spark plug on the
engine block, start the engine, check whether there was continuous blue and
white high pressure fire.
Inspect ignition system
4
Softly turning throttle, observe whether easy to start.
Cleaning throttle and
idle airways
5
Check whether the air filter is clogged, and whether there is a leak in the intake
port (especially the intake pipe connection).
Inspect intake system
6
Check spark plug and observe the type and clearance
adjust or replace
7
Check engine cylinder pressure to see if there is insufficient cylinder pressure.
Exclude engine
mechanical failure (pay
attention to check
whether engine valve
clearance is too small).
8
Check whether the fuel label (and whether it contains ethanol) meets the
requirements of the vehicle.
replace fuel
Содержание GP125S
Страница 1: ......
Страница 2: ......
Страница 20: ...19 3 Clutch driving wheel locator Z03 4 Shaft bearing punch Z06 1 Z06 8 5 Oil seal punch Z07 1 Z07 9 ...
Страница 22: ...21 2 General tools No Name Picture 1 T sleeve 8 10 12 14 2 Tool case 1 ...
Страница 23: ...22 3 Tool case 2 4 Spring pliers 5 Screwdriver ...
Страница 24: ...23 6 Pliers 7 Nylon hammer 8 Multimeter ...
Страница 55: ...54 ELECTRICAL SYSTEM Components arrangement ...
Страница 56: ...55 ...
Страница 60: ...59 Harness diagram ...
Страница 61: ...60 Conceptual diagram ...
Страница 69: ...68 ...
Страница 73: ...72 4 Unscrew and remove the 2 screws shown no 9 5 Take down the air filter and front fender ...
Страница 105: ...104 ...
Страница 108: ...107 ...
Страница 110: ...109 2 Use special tool to compress valve spring and take out valve lock clip ...
Страница 123: ...122 EFI SYSTEM The vehicle uses the Magneti Marelli EFI system The schematic diagram as follows ...
Страница 144: ...143 Throttle valve disassembly and installation 1 Remove the fuel tank 2 Disconnect the plug ...
Страница 161: ...160 COOLING SYSTEM System composition ...
Страница 170: ...169 ...