background image

2.4 x 1.8 (8’ x 6’) Premier Shiplap
Modular Shed

English SS197C

Before assembly

We recommend that time is taken to read the 
instructions before starting assembly, then 
follow the easy step by step guide. 
The instruction sheet is only a guide to 
the assembly. Certain items may not be 
shown to scale. 

Check all components prior to assembly

This product should be assembled by no
less than two people.

Never attempt to erect the assembly in
high winds.

Drill components where indicated.

Assembly Instructions

Recommended tools for assembly

Cross head screw driver

10mm spanner 

Hammer

Sharp knife

Drill

3mm diameter drill bit

Spirit level 

Silicon sealant 

Step ladder

x 2

No.

Components

Qty.

1

Floor panel

2

2

Large plain panel 

(Width 1174mm)

2

3

Small plain panel 

(Width 850mm)

2

4

Window plain panel

2

5

Front panel

2

6

Apex panel

2

7

Door header rail 

(29 x 29 x 1200mm)

1

8

Roof rafter

8

9

Roof panel 

(1140 x 809mm)

6

10

Felt batten 

(29 x 29 x 1213mm)

4

11

Felt batten block

4

12

Left door

1

13

Right door

1

14

Door rebate coverstrip 

(32 x 12 x 1685mm)

2

15

Roof felt 

(5m)

1

16

Roof ridge felt 

(2.5m)

1

17

Coverstrip 

(12 x 40 x 1710mm)

7

18

Window frame

2

19

Window perspex 

(515x560mm)

2

20

Window beading 

(565mm)

4

21

Window beading 

(500mm)

4

22

Door coverstrip 

(12 x 40 x 830mm)

2

23

Bargeboards

4

1

2

3

12

6

8

5

4

7

11

10

9

13

15

No.

Fixing kit

Qty.

24

Roof gussets

4

25

Finial

2

26

T-hinge (254mm)

6

27

Turn button

1

28

Padbolt

1

29

Towerbolt

2

30

Storm proof hinges

2

31

Window Stay

1

32

50mm coachbolts

4

33

6mm washers

4

34

6mm nuts

4

38

25mm screws

60

39

22mm screws

13

40

19mm round head screws

12

41

30mm nails

113

42

20mm nails

24

43

10mm felt nails

124

16

17

18

19

20

21

22

23

Drill

35

63mm screws

16

 36

50mm screws

40

37

38mm screws

20

24

25

26

27

29

30

31

14

28

RECOMMENDED BASE AREA

A recommended base area of no less

than 1870mm x 2450mm

Содержание SS197C

Страница 1: ...x panel 2 7 Door header rail 29 x 29 x 1200mm 1 8 Roof rafter 8 9 Roof panel 1140 x 809mm 6 10 Felt batten 29 x 29 x 1213mm 4 11 Felt batten block 4 12 Left door 1 13 Right door 1 14 Door rebate coverstrip 32 x 12 x 1685mm 2 15 Roof felt 5m 1 16 Roof ridge felt 2 5m 1 17 Coverstrip 12 x 40 x 1710mm 7 18 Window frame 2 19 Window perspex 515x560mm 2 20 Window beading 565mm 4 21 Window beading 500mm ...

Страница 2: ...hown in the diagram using 3 x 25mm screws per hinge stand the hinge end of the window on the window panel making sure it is centred at the top of the window opening Open the hinges and secure them to the window panel frame using 3 x 25mm screws per hinge On the inside of the window panel fit the window stay and its two posts using 6 x 25mm screws as shown in the diagram For the fixed window Put th...

Страница 3: ...ming as shown The door frame coverstrips are positioned between the floor and the header rail Attach the coverstrips flush to the framing of the front panels using 4 x 30mm nails per strip 6 Roof sections To the first roof panel secure a roof rafter flush to the right hand edge of the panel ensure the correct angled end of the rafter is flush to the short edge of the panel as shown below Attach us...

Страница 4: ... upper edge Felt upper edge 30mm 30mm 30mm 9 Coverstrips bargeboards and finials Fit a coverstrip into each corner attach using 3 x 30mm nails per strip The remaining three are used to cover the panel joins on each side and back of the building attach using 3 x 30mm nails per strip Attach bargeboards at the front so that the top edge is flush with the roof line and the two boards meet evenly in th...

Страница 5: ...atment To VALIDATE the guarantee the building must be properly treated with a recognised external wood preserver WITHIN 3 MONTHS of assembly and RE TREATED ANNUALLY thereafter Adequate provision must be made to ensure ground contact is avoided and air is able to circulate underneath the building Placing the building on a concrete pad or slab base is acceptable provided that the building is not all...

Отзывы: