background image

9. Door fitting

Open the hinge flat and position it on the left side of the door as show, secure in place using 9 x 25mm screws. Position the door in the door way, adjust the height of the
door so it will be able to open and close freely. When in place secure the hinge to the door frame using 9 x 25mm screws.

25mm

  

Door

Door

Gap

No gap

Important

When fitting the hinge ensure there is
no gap between the front of the door
and the hinge bar.   

Front apex

Rear apex

Roof panels

Side view of roof position

50mm

50mm

Felt

batten

Felt

batten

30mm

8. Roof

Secure two felt battens to the lower edge of the two short roof panels using 12 x 30mm nails. Ensure the felt battens are flush to the edges of the panels. In the same way
attach two felt battens to the lower edge of the two large roof panels. Flush to the front and rear edges of the large roof panel attach three bargeboard blocks using
2 x 30mm nails per block. To the small roof panel attach two blocks front and rear. See diagram below for correct spacing of the blocks. Position two panels on top of the
building, make sure the top edges of the panels are located at the apex and bargeboard blocks at the back are butted up against the outside of the apex panel. Secure the
small panel in place using 18 x 35mm screws. Screw through the roof panel and into the purlins and the top of the side wall. Attach the large panel in the same way using 24
x 35mm screws.

560mm

420mm

Large roof panel

Small roof panel

Bargeboard block spacing

Attach a set of blocks to the

rear of the roof.

Important

35mm

1260mm

Bargeboard blocks at the back of
the building must be butted up
against the outside of the rear
apex panel.

30mm

25mm

Отзывы: