8. Coverstrips, bargeboards and finials

Fit a coverstrip into each corner, attach using 3 x 30mm nails per strip. The remaining two are used to cover the panel joins on each side, attach using 3 x 30mm nails per
strip. Attach bargeboards at the front so that the top edge is flush with the roof line and the two boards meet evenly in the middle secure using 3 x 30mm nails per board.
Repeat for the bargeboards on the back. On the front attach a finial centrally over the join between the bargeboards use 2 x 30mm nails. Repeat for the finial on the back.

2008 © Rowlinson Garden Products Ltd

We constantly improve the quality of our products,
occasionally the components may differ from the
components shown and are only correct at time of
printing. We reserve the right to change the
specification of our products without prior notice.

If in doubt of any aspect regarding the assembly, use or safety of your building please contact us :

Help Line (Normal Office Hours)  01829 261121

ROWLINSON GARDEN PRODUCTS LIMITED
Green Lane 
Wardle Nr.Nantwich
Cheshire
CW5 6BN

Important information - retain for future reference

Shiplap buildings come ready stained but this is only a preparatory treatment. To 

VALIDATE

the guarantee, the building must be properly treated with a recognised

external wood preserver 

WITHIN 3 MONTHS

of assembly and 

RE-TREATED ANNUALLY  

thereafter. The building must also be erected on 50mm x 50mm treated

wooden or similar bearers (These are not supplied with the kit.) Ground contact must be avoided.

Timber Information.

As timber is a natural material, there are certain weather conditions that may affect the materials properties. In times of excessive dry spells the material may lose some
of its internal moisture causing a certain degree of shrinkage on a panel and in periods of excessive rain there will be a certain amount of swelling throughout the
wooden panels. This process can not be avoided. If you have problems with certain boards shrinking in dry spells try to decrease the amount of direct sunlight on the
building or the amount of air passing over the building. During hot spells spray water directly onto the panels with the aid of a garden hose.

9. Fitting the door

Place the door into position. Fix the three T-hinges to the door with 4 x 32mm screws per hinge. Secure the hinges to the door frame using 3 x 32mm screws per hinge.
Fit the turn button to the door frame using 1 x 32mm screw and then fit the hasp and staple with 7 x 19mm round head screws, see the diagram for the position of these.

32mm

32mm

19mm

10. Glazing

It is recommended that a waterproof sealant is applied around the edge of the glazing before fitting. From the outside of the building fit the acrylic window into the plastic
cill strip, fix the window in place with the wooden window beading strips  at each side and the top using 3 x 20mm nails per beading strip.

View from outside of building