Section 2 Installation
SG10XY Manual
www.rottlermfg.com
2-3
MACHINE START-UP
When starting the machine for the first time, it may move out of control. Make
sure all hands are clear of machine parts. Be ready to press the Emergency
Stop button if needed.
______Turn main power on from the main incoming breaker box.
MACHINE MOVEMENTS
______Make sure there is nothing obstructing the full vertical travel of the machine.
______When the machine is on the clamp mode and the air pressure is with the requirements, try to
move workhead to verify that you have a solid clamp of Work head.
______Place the level on the leveling post. The level assembly is referenced to the spindle via the level
pin. It is therefore important to check alignment of the pin in reference to the spindle. Even though
the level has been carefully calibrated at the factory, it is a good idea to recheck calibration before
putting the machine into service. In the event that the level is dropped or handled roughly then the
following recalibration methods should be implemented. If calibration is required refer to manual
for Calibrating the Digital Level
______Start the spindle and verify operation.
INSTRUCTING THE OPERATOR:
Note: Rotter employees and representatives per company policy are not permitted to provide end
user of Rottler equipment with any OEM specifications for the workpiece that is created by end
user using Rottler equipment.
______Explain to the customer and operator that at NO time is there to be any software or hardware
other than Windows Auto Update and Rottler installed on this machine. This includes screen
savers, anti-virus software, and any hardware device that installs software on the machine.
Installation of screen savers and anti-virus software can cause dangerous control problems. Any
installation of software or hardware will void the warranty on the machine.
______Explain to the customer and operator that the machine should be hooked up to the Internet
anytime it is on. The software on the machine will automatically connect to our server to send
back useful information on machine status.
______Connect customer supplied Internet to the machine. Verify that the Internet is accessible from the
machine.
______Once the machine has been fully setup and is ready for operation create a Skype account for the
machine following the instructions in the Installation Section of the manual.
______Explain to the customer and the operator how the to log onto Skype and communicate with Rottler
when needed.
______Computer Viruses will cause the machine control system to become unstable. This may cause
the machine to make uncontrolled moves which could create a dangerous environment for the
machine operator.
Содержание SG10XY
Страница 2: ......
Страница 4: ......
Страница 10: ...Section 1 Introduction SG9MTS Manual www rottlermfg com 1 5...
Страница 19: ...Section 2 Installation SG10XY Manual www rottlermfg com 2 8 Machine Dimensions...
Страница 20: ...Section 2 Installation SG10XY Manual www rottlermfg com 2 9 Clearance Dimensions 78 110 Requird Clearances...
Страница 71: ...Section 5 Operating Instructions SG10XY Manual www rottlermfg com 5 17 Rottler Six and One Instructions...
Страница 72: ...Section 5 Operating Instructions SG10XY Manual www rottlermfg com 5 18...
Страница 73: ...Section 5 Operating Instructions SG10XY Manual www rottlermfg com 5 19...
Страница 84: ...Section 5 Operating Instructions SG10XY Manual www rottlermfg com 5 30...
Страница 90: ...Section 6 Maintenance SG10AXY Manual www rottlermfg com 6 5...
Страница 93: ...Section 6 Maintenance SG10AXY Manual www rottlermfg com 6 8 Spindle Lock Nut Service Procedure...
Страница 97: ...Section 6 Maintenance SG10AXY Manual www rottlermfg com 6 12 Setting the Play of Z Axis Ball Screw...
Страница 98: ...Section 6 Maintenance SG10AXY Manual www rottlermfg com 6 13...
Страница 106: ...Section 8 Machine Parts SG10XY Manual www rottlermfg com 8 3 Machine Parts Base Table and Riser Assembly...
Страница 110: ...Section 8 Machine Parts SG10XY Manual www rottlermfg com 8 7 Base Assembly 88 89 87...
Страница 113: ...Section 8 Machine Parts SG10XY Manual www rottlermfg com 8 10 Spindle Assembly TOTAL LEN 30 125...
Страница 117: ...Section 8 Machine Parts SG10XY Manual www rottlermfg com 8 14 Transmission Assembly...
Страница 123: ...Section 8 Machine Parts SG10XY Manual www rottlermfg com 8 20 Solenoid Valves...
Страница 129: ...Section 8 Machine Parts SG10XY Manual www rottlermfg com 8 26 Air Line Diagram...
Страница 130: ...Section 8 Machine Parts SG10XY Manual www rottlermfg com 8 27...
Страница 132: ...Section 9 Options SG10XY Manual www rottlermfg com 9 2...
Страница 134: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 2...
Страница 135: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 3...
Страница 136: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 4...
Страница 137: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 5...
Страница 138: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 6...
Страница 139: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 7...
Страница 140: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 8...
Страница 141: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 9...
Страница 142: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 10...
Страница 143: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 11...
Страница 144: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 12...
Страница 145: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 13...
Страница 146: ...Section 10 Material Data Safety Sheets SG10XY Manual www rottlermfg com 10 14...