Roth Cyclo II Скачать руководство пользователя страница 3

gk  02/2006 

3

4. Initial operation 
 

Before use, it must be checked whether the available mains voltage corresponds with the voltage given on 
the rating plate. 
After switching on the voltage supply, the operation control 

15

 shines. 

By turning the speed control 

16,

 the speed can be adjusted from 0 - max . 

Turn the direction switch 

17

 left = anticlockwise rotation, right = clockwise rotation or middle = stop. 

 

 
 
 

 

 
 
 
 

5. Tube cartridges and Tubes 

 

5.1 Selection of the correct tube cartridge 

Each time a tube is inserted and the tube changed, it must be ensured that the cartridge is designed for the 
tube used. Only pump hoses with a wall thickness of 1.6 mm are suitable for use.  
 

 

Hose ID (mm)/  
hose cassette      

1.6 / 1.6 (Y375.1) 

3.2 / 3.2 (Y376.1) 

4.8 / 4.8 (included in delivery) 

3-roll head: Pumping 
capacity (ml/min)

 

1.5 - 30        

6 - 110 

12 - 240        

6-roll head: Pumping 
capacity (ml/min)

 

1.2 - 24        

4.4 - 88        

9.6 - 192       

 

 
 
 

Fig. 3:  
Individual parts of the pump head 

1 Pressure 

screw 

2 Lock 

nut 

3 Pivot 

lever 

4 Tube 

cartridge 

5 Roller 

rotor 

6 Transport 

rollers 

7 Feed 

tube 

8 Tube 

clamping 

9 Stud 

bolts 

10 

Manual nut for dismantling 

11 Thrust 

bearing 

12 Drive 

shaft 

13 Driving 

pin 

14 Main 

body 

15 

Front plate with  bearings

 

Содержание Cyclo II

Страница 1: ...ence This instruction manual will familiarize you on how to operate and use our pericyclic pump Roth Cyclo ll Please read it thoroughly before operating the unit Operating Instructions Page 1 Delivery includes 2 2 Safety instructions 2 3 Areas of Application 2 4 Initial operation 3 5 Tube cartridges and Tubes 3 5 1 Selection of the correct tube cartridge 3 5 2 Inserting and replacing Tube 4 6 Sett...

Страница 2: ...ched off mains plug removed Only authorised original spare parts accessories may be used The use of other parts conceals unknown risks and must be refrained from in every case Any necessary checks service or repair work may only be carried out by Carl Roth GmbH Co KG otherwise we are unable to guarantee the operatability and safety of the unit Carl Roth GmbH Co KG is not liable for damage to the m...

Страница 3: ...e a tube is inserted and the tube changed it must be ensured that the cartridge is designed for the tube used Only pump hoses with a wall thickness of 1 6 mm are suitable for use Hose ID mm hose cassette 1 6 1 6 Y375 1 3 2 3 2 Y376 1 4 8 4 8 included in delivery 3 roll head Pumping capacity ml min 1 5 30 6 110 12 240 6 roll head Pumping capacity ml min 1 2 24 4 4 88 9 6 192 Fig 3 Individual parts ...

Страница 4: ... ensure pumping reliability 6 Secure lock nuts 2 by turning to the right Important If counter pressure exists the pressure setting must be carried out under operating pressure This aforementioned setting can now be retained unchanged for the same operating conditions i e for the same counter pressure and the same pumping tube Changing the tube is therefore significantly simplified as only the pivo...

Страница 5: ...ody can be removed by loosening the 3 crosshead screws and then cleaned Rinse off all removable parts with tap water if necessary with cleaning additives dry off and reassemble in the reverse order Attention Place the roller rotor 5 on the drive shaft so that the driving pin 13 sits in the groove on the rear of the roller rotor 5 Occasional cleaning as described above is urgently recommended after...

Страница 6: ...roughly Use tube suitable for tube cartridge If the pump is shut down especially for several hours or days the tube should be relieved of the pressure otherwise a permanent deformation of the tube can be induced and the pump will no longer work perfectly 11 Technical Data Dimensions WxHxD 134 x 131 x 190 mm Weight 1 700 g Voltage 230 VAC Fuse T 0 2 A 250V Drive DC Motor with planetary gears Power ...

Отзывы: