
gk 02/2006
3
4. Initial operation
Before use, it must be checked whether the available mains voltage corresponds with the voltage given on
the rating plate.
After switching on the voltage supply, the operation control
15
shines.
By turning the speed control
16,
the speed can be adjusted from 0 - max .
Turn the direction switch
17
left = anticlockwise rotation, right = clockwise rotation or middle = stop.
5. Tube cartridges and Tubes
5.1 Selection of the correct tube cartridge
Each time a tube is inserted and the tube changed, it must be ensured that the cartridge is designed for the
tube used. Only pump hoses with a wall thickness of 1.6 mm are suitable for use.
Hose ID (mm)/
hose cassette
1.6 / 1.6 (Y375.1)
3.2 / 3.2 (Y376.1)
4.8 / 4.8 (included in delivery)
3-roll head: Pumping
capacity (ml/min)
1.5 - 30
6 - 110
12 - 240
6-roll head: Pumping
capacity (ml/min)
1.2 - 24
4.4 - 88
9.6 - 192
Fig. 3:
Individual parts of the pump head
1 Pressure
screw
2 Lock
nut
3 Pivot
lever
4 Tube
cartridge
5 Roller
rotor
6 Transport
rollers
7 Feed
tube
8 Tube
clamping
9 Stud
bolts
10
Manual nut for dismantling
11 Thrust
bearing
12 Drive
shaft
13 Driving
pin
14 Main
body
15
Front plate with bearings