[
4
]
I n s t a l l a t i o n a n d c o n n e c t i o n
Connection scheme:
1 Storage tank
2 PE-X-pipe heat exchanger
3 Loading heat exchanger
4 Heat pump supply
5 Heat pump return
6 Cold water connection (accord. DIN 1988)
7 Temperature sensor
8 Hot water outlets
9 Heating circulation pump
10 Circulation pump storage water
11 Sanitary load pump
12 Nonreturn valve
13 Boiler
14 Connection assembly ANS2
Illustration 1
1
2
3
11
10
5
4
12
9
8
7
6
14
13
Place the tank on an even and smooth floor.
Cold water
The cold water connection has to be installed
according to DIN 1988 (see illustration).
At a water pressure of more than 4 bars you
need a pressure reducer. The operational pres-
sure must be adjusted to max. 4 bars.