Rotex Heating Systems GmbH
28
5.7.8
Vertical roof terminal and vertical double flue system
Unit category: C33
CAUTION
If the combi feedthrough vertical cannot be applied, the air
supply and combustion gas outlet must be carried out
separately.
•
Combi feedthrough vertical.
Permitted pipe length
For parallel: Air supply and combustion gas outlet together, excluding the length of
the combi feedthrough.
For concentric: total pipe length, excluding the length of the combi feedthrough.
Parallel
Concentric
60/100
Concentric
80/125
RKOMBG22AAV1
100 m
11 m
29 m
RKOMBG28AAV1
85 m
10 m
29 m
RKOMBG33AAV1
80 m
10 m
29 m
Combustion gas outlet and air supply pipe
For assembly, see par. 5.7.5 General assembly.
Assembly vertical roofterminal
1.
Fit a vertical feedthrough panel with scale at the location of the outlet on a
sloped roof.
A flat roof requires an adhesive panel for a Ø126 mm pipe.
2.
Disassemble the manifold from the combi feedthrough.
3.
Slide the combi feedthrough from outside to inside:
In case of a sloped roof, through the vertical feedthrough panel with scale.
In case of a flat roof, through the adhesive panel.
4.
In case of a parallel connection, fit the manifold of the combi feedthrough and
secure it with a sheet metal screw or pop rivet.
Содержание RKOMBG22AAV1
Страница 1: ...ROTEX Heating Systems GmbH RKOMBG22AAV1 RKOMBG28AAV1 RKOMBG33AAV1 Installation instructions English...
Страница 55: ......
Страница 56: ...885527 4P374379 1A...