![Rotax 125 MAX DD2 evo Скачать руководство пользователя страница 50](http://html1.mh-extra.com/html/rotax/125-max-dd2-evo/125-max-dd2-evo_installation-instructions-and-operators-manual_1489750050.webp)
BRP-Rotax
INSTALLATION MANUAL
Figure 7.5
1
Hose package
Step
Procedure
4
Attach the fuel line of the hose pack-
age (pos. 1) to the impulse nipple on
the engine housing..
NOTE
Check that valve is not the lowest point of the
impulse circuit to prevent that condensation af-
fects a proper operation.
Figure 7.6
1
Hose package
Step
Procedure
5
Attach cable tie with mount (pos. 1) to
the housing.
Figure 7.7
1
Cable tie
2
Impulse nipple
Step
Procedure
6
Secure both lines with cable tie, ensur-
ing that the black hose is on top.
ATTENTION
Do not tighten cable ties too tight, because
constricted lines can lead to loss of function.
Step
Procedure
7
Attach an additional cable tie (pos. 3)
as shown in figure.
Effectivity: 125 MAX DD2 evo
Page 5
Edition: September 01 2019
Содержание 125 MAX DD2 evo
Страница 2: ...General information BRP Rotax recommends products of the following companies...
Страница 10: ...BRP Rotax INSTALLATION MANUAL Effectivity 125 MAX DD2 evo INTRO Page 5 Edition September 01 2019...
Страница 63: ...Operator s Manual...
Страница 65: ...Page 2 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Страница 67: ...Page 2 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Страница 73: ...Page 6 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Страница 81: ...Page 8 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Страница 101: ...BRP Rotax Operators Manual Figure 3 15 Adjusted 3 Page 20 Edition September 01 2019 Effectivity 125 MAX DD2 evo...
Страница 113: ...Page 12 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Страница 119: ......