![Rotax 125 MAX DD2 evo Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/rotax/125-max-dd2-evo/125-max-dd2-evo_installation-instructions-and-operators-manual_1489750031.webp)
BRP-Rotax
INSTALLATION MANUAL
Figure 4.6
NOTE
The battery terminals must point in the direction
of the control unit.
Figure 4.7
1
Battery terminals
Step
Procedure
3
Connect the positive terminal (red) of
the battery.
4
Connect the negative terminal (black)
of the battery.
Figure 4.8
Step
Procedure
5
Install the battery cover onto the bat-
tery holder.
NOTE
Make sure that the two retaining lugs (pos. 1)
are in the notches of the battery cover!
Step
Procedure
6
Tighten flange head screw (pos. 2) of
the battery cover.
Figure 4.9
1
Retaining lugs
2
Flange head screw
Page 6
Edition: September 01 2019
Effectivity: 125 MAX DD2 evo
Содержание 125 MAX DD2 evo
Страница 2: ...General information BRP Rotax recommends products of the following companies...
Страница 10: ...BRP Rotax INSTALLATION MANUAL Effectivity 125 MAX DD2 evo INTRO Page 5 Edition September 01 2019...
Страница 63: ...Operator s Manual...
Страница 65: ...Page 2 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Страница 67: ...Page 2 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Страница 73: ...Page 6 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Страница 81: ...Page 8 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Страница 101: ...BRP Rotax Operators Manual Figure 3 15 Adjusted 3 Page 20 Edition September 01 2019 Effectivity 125 MAX DD2 evo...
Страница 113: ...Page 12 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Страница 119: ......