NOTE:
If more than 2 horse shoe shims are used at any of
the column anchor bolts, pack non-shrink grout under the
unsupported area of the column base. Insure shims are
held tightly between the baseplate and floor after torquing
anchors.
(2)--3/4" Spacers
1/4"-20NC x 2-3/4" HHCS & Locknut
Star Washer
Flat Washer
(2) 1/4”-20NC-3/4” HHCS
Overhead Switch
1/16" Gap
7. IMPORTANT:
Using the horse shoe shims provided, shim
each column base until each column is plumb. If one column
has to be elevated to match the plane of the other column, full
size base shim plates should be used (Reference Shim Kit
N774-1 Shim). Recheck columns for plumb. Tighten anchor bolts
to an installation torque of 110 ft-lbs. Shim thickness MUST NOT
exceed 1/2” when using the 5-1/2” long anchors provided with
the lift, Fig. 6.
If anchors do not tighten to 110 ft-lbs. installation torque, replace
concrete under each column base with a 6' x 6' x 6" thick 3000
PSI minimum concrete pad keyed under and flush with the top
of existing floor. Let concrete cure before installing lifts and
anchors.
Fig. 7a
Fig. 7a
8.
Mount Switch
assembly towards power unit column
as shown, Fig. 7, using (2) 1/4"-20NC x 3/4" lg. HHCS, nuts
and Washers.
Insert 1/4"-20NC x 2-3/4" HHCS through pivot hole in end
of switch bar. Insert opposite end of bar through slot in
switch mounting bracket, Fig. 7a. Then secure HHCS and
Switch Bar to overhead as shown, Fig. 7, using (2) 3/4"
spacers and 1/4”-20NC Locknut. Tighten Hex bolt leaving
1/16” gap between the spacer and the overhead assembly.
COVER NOT SHOWN