Rev. 15-Oct-15
Pg. 1/14
www.roswellwakeair.com
If you have any questions please call : 1-855-962-WAKE(9253)
Information:
Warranty:
Contents of Bimini Box
Pro Edge Tower
Bimini Installation
Instructions
Tools Required
5/16" Allen Key
3/16" Allen Key
THREADLOCKER
Phillips Screwdriver
RED
Roswell recommends 2 people for installation of the bimini.
Drill
9/64” Drill Bit
x4
x2 x6
Pivot
Washer
x2
Bimini Frame,
Canvas, Clips
and Boot
Center Punch
Marker
2 inch Low Tack
Masking Tape
Utility Knife
x2
***Important***
Read & follow these installation instructions carefully. Failure to do so may result in an improper
bimini installation. Damage to parts due to improper bimini installation is not covered under warranty.
10-24 UNC Tap
Towers and tower accessories require regular maintenance. Tower hardware and retaining bolts can become loose with normal
operation; it is owner’s responsibility to ensure all hardware is kept tight and secure. Corrosion and/or oxidation on coated
surfaces as well as on all hardware are specifically excluded from warranty as their care, maintenance, and environments of use
cannot be controlled by Roswell Wake Air. Damage due to misuse or improper care is also excluded from warranty. For full
warranty details please contact your local dealer.
Shim
Washer
x4
Plastic
Washer
x4
5/16” Drill Bit
1/2-13 x 1.50”
Attention
Installing your bimini clips in
freezing or near freezing
temperatures is
NOT
recommended. Failure to
do so will result in broken
bimini clips. Damage to
parts from improper use is
not covered under warranty.
Port Bimini Arm
Starboard Bimini Arm