Parts
AnoFrame VersaMount
TM
Weighted Base
split rails
solid rail
Incept-9.6.02
Figure 1
The AnoFrame VersaMount is a trademark of Rose Displays, Ltd. Neither
the manufacturer nor any sales agent may be held liable for injury, loss
or damage resulting from the use of these products.
Part #02INSVersaMountRoundBase
Figure 3
Corner
Brackets
AnoFrame
Rails
AnoFrame
Split Rails
Figure 2
Figure 4
Screw Tab
Transitional
Collar
Vertical
Post
Weighted
Base
Instruction Sheet (page 1 of 2)
#97-0431
solid rail
solid rail
split rails
Figure 5
Step 1
Locate the two split rails and the solid
rail that is the same length as the split
rails.
Insert corner brackets into side
AnoFrame rails. Insert two corner
brackets into each end of the solid side
Ano rail. Insert one corner bracket
into each end of each split side Ano
rail.
Fig. 1 & Fig. 2
Note:
Tension tabs on corner
brackets face towards outside of
frame.
Step 2
Slide screw tab into channel of bottom
Ano rail.
Fig. 3
.
Step 3
Place transitional collar over screw tab
and push onto frame.
Fig. 4.
Step 4
Finish assembling frame following the
sequence in
Fig. 5
.
Note: Placement of split rails will
depend on type of frame. Split rails
will be on the top for top-loading
frames and on the side for side-
loading frames.
Instructions For Assembly