![roost&root Slant-Roof Greenhouset Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/roostandroot/slant-roof-greenhouset/slant-roof-greenhouset_assembly-instructions-manual_1485571016.webp)
A
s
s
e
m
b
ly
I
n
s
tr
u
c
ti
o
n
s
S
la
n
t-
R
o
o
f
G
re
e
n
h
o
u
s
e
™
V
1
S
p
ri
n
g
2
0
2
1
C
o
p
y
ri
g
h
t
®
R
o
o
s
t
&
R
o
o
t
a
ll
r
ig
h
ts
r
e
s
e
rv
e
d
.
S
c
re
w
T
o
g
e
th
e
r
L
e
ft
&
M
id
d
le
R
o
o
f
S
e
c
ti
o
n
s
Page 15
8.1 Attach Middle Roof Section To Left Side Roof Section:
Using T25 screws and provided bit, drive screws in the approximate locations as illustrated while
pushing up on roof sections as needed to make sure bottom edges of each section are flush with one another. See FIG 8A. Holes are not pre-drilled. Drive screw
towards the middles of the wood and their aggressive thread will self pierce.
8.2 Front Leading Edge:
Using T25 screws and carefully standing on at least a 6 foot step ladder or similar... drive a screw in the approximate location as
illustrated in FIG 8B while pushing up on roof sections as needed to make sure bottom edges of each section are flush with one another and the front leading edge
looks straight.
8.3 Back Trailing Edge:
Using T25 screws, drive a screw in the approximate location as illustrated in FIG 8C while pushing up on roof sections as needed to make
sure bottom edges of each section are flush with one another and the back trailing edge looks straight.
Fig 8A
Make Seam Flush
Make Seam Flush
Make Seam Flush
Outside
Front
Outside
Back
Fig 8B
Fig 8C
A little roof structure work.... still more to come. It's big!