![roost&root Slant-Roof Greenhouset Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/roostandroot/slant-roof-greenhouset/slant-roof-greenhouset_assembly-instructions-manual_1485571010.webp)
A
s
s
e
m
b
ly
I
n
s
tr
u
c
ti
o
n
s
S
la
n
t-
R
o
o
f
G
re
e
n
h
o
u
s
e
™
V
1
S
p
ri
n
g
2
0
2
1
C
o
p
y
ri
g
h
t
®
R
o
o
s
t
&
R
o
o
t
a
ll
r
ig
h
ts
r
e
s
e
rv
e
d
.
3
P
a
n
e
l
P
u
s
h
Page 09
Lets get this done... 3 panels at once!
5.1 Install Bottom F2 Panel:
You know the drill. Using the provided T25 screws where
indicated by the green arrows, attach F2 to F1 keeping top edge & faces as flush as
possible. See FIG 5A.
5.2 Install F4 Panel:
Place panel F4 on top of panel F1 making sure bottom edges and
side edges where F4 meets L4 & F1 are as flush as possible. Attach using T25 screws
as indicated by the green arrows. See FIG 5A.
5.3 Install B2 Panel:
Aligning faces and top edge of panel B2 to panel B3, install T25
screws as indicated by the green arrows in FIG 5B.
Fig 5A
Fig 5B
L2
L1
L4
F4
F1
F2
B3
B2
Make All Tops
As Flush As
Possible
Sides Flush
Make All Tops As
Flush As Possible
Keep faces
flush
Faces
Flush