![roost&root Slant-Roof Greenhouset Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/roostandroot/slant-roof-greenhouset/slant-roof-greenhouset_assembly-instructions-manual_1485571012.webp)
A
s
s
e
m
b
ly
I
n
s
tr
u
c
ti
o
n
s
S
la
n
t-
R
o
o
f
G
re
e
n
h
o
u
s
e
™
V
1
S
p
ri
n
g
2
0
2
1
C
o
p
y
ri
g
h
t
®
R
o
o
s
t
&
R
o
o
t
a
ll
r
ig
h
ts
r
e
s
e
rv
e
d
.
R
o
o
f
S
e
c
ti
o
n
1
U
n
fo
ld
&
P
la
c
e
m
e
n
t
Page 11
1. Stage Roof Section:
Carry the roof section into the open end of the partially assembled
structure. positioned with the hinged end going in first and the shorter side of the roof assembly
facing the back of the greenhouse.
2. Stand Up & Fold Open:
The first person in stands their end up and the short side is folded
over the back side of the greenhouse while the long side is straightened out over the front.
3. Slide Over Into Position:
After unfolding, slide the roof up and into position over the triangle
side of the side wall. You will use the side triangle as a ramp and to hold some of the load.
4. Slide Up & Over The Top:
While lifting a little to take weight off, LIFT & SLIDE the assembly
up and over the front wall of the greenhouse.
This procedure is repeated for all roof sections.
We didn't want you crawling up on the roof...
Maybe 3 People
If You Aren't
Comfortable
With Weight
The concept of the pre-assembled scissor roof...
General procedure... instructions on next page.
1
2
3
4
The polycarbonate roof is very, very flexible and will not break if you rest weight on it.