![RoMedic Rena 440 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/romedic/rena-440/rena-440_manual_1484049007.webp)
VER 3.0D
7
07/2009
Final Inspection
•
Final inspection of the lift is required
before putting the lift into service. Once
the lift has been removed from it’s
shipping pallet, inspect it for signs of
damage.
•
Make sure all four casters are working
properly, check castor locks (figure 1)
•
Inspect all connections, nuts and bolts.
Look at the packing material to see if any
loose nuts, bolts, screws are discovered. If
any are found identify where they go and
put them back on.
•
Turn the emergency stop button clockwise
so it pops out. (figure 2)
•
Now the lift should be ready for
operation. Take the hand control and push
the up bottom. Run the lift arm all the way
up. Then push the down button and run
the lift all the way down.
•
Verify the emergency stop button works
by pushing it in and push the up or down
button to verify the lift doesn’t work.
•
Follow the instructions for a sling that you
are using and lift a person (that is not a
patient) in the lift to test operation.
•
Verify that emergency lowering works with
someone in the lift. (figure 3)
•
If everything has checked out
satisfactorily, plug the lift in for charging,
verify the yellow charging light comes on.
(figure 4)
•
View the video in-service DVD for proper
training on the Rino before you put the lift
into use with a patient.
1
2
3
4