Step 2 - Fitting the Wall Profiles

1. 

Decide which side of the alcove the pivot side of the enclosure is to be fitted. Place the longer Wall Profile 

15mm in from the outside of the tray. The longer leg of the Wall Profile must be on the outside of the 

enclosure, towards the front of the tray. Make sure the Wall Profile is completely vertical using a spirit 

level and mark the wall through the slots with a pencil.

2. 

Drill the wall with a 6mm Masonry Drill Bit (not supplied) where the Wall Profile is to be positioned. Fit the 

Wall Plugs supplied (if going in to a brick or block wall). If going into a plasterboard wall you will need to 

purchase appropriate wall fixings. Wipe clear all debris from the Tray before referring to the next stage.

3. 

Where the Wall Profile is to be positioned on the Tray, place a bead of Bathroom Sealant (not supplied) 

the width of the Wall Profile along the tiled wall. Screw the Wall Profile to the wall with 40mm Screws 

(supplied). Do not over tighten the screws into the Wall Profiles as this will misshape the Wall Profile. 

Ensure the Wall Profile stays completely vertical throughout this procedure using a Spirit Level.

•  Failure to carry out this procedure correctly can result in serious water damage and is not covered by 

the Guarantee.

•  No sealant to be present between the Wall Profiles and the tiled walls vertically prior to screw fixing.

4. 

Seal the gap on the inside between the Tray and Wall Profile with a Bathroom Sealant (not supplied). 

•  Failure to carry out this procedure correctly can result in serious water damage and is not covered by 

the Guarantee.

5. 

Repeat these steps for the shorter Wall Profile on the opposite wall.

IMPORTANT: This product features two different length Wall Profiles. See notes below.

Short Leg

Long Leg

Содержание N2F7613S

Страница 1: ...duct is going to be installed on are vertical 10 It is strongly recommended the product is fitted on a tiled surface or similar waterproof surface 11 It is strongly recommended the walls are tiled and grouted before the product is installed 12 If the walls and or the tray are not level you will not achieve maximum adjustment of the product 13 Pictures used are for illustration purposes only produc...

Страница 2: ...o an alcove measure the opening at the top middle and bottom after all tiling and grouting has been done Check this against the dimensions given in the table shown above to see if your alcove meets the criteria Check the plumbing for leaks Do not plasterboard over the tray Do not grout the tiles when the enclosure has been fitted as the grout may discolour the aluminium Product Code Minimum Alcove...

Страница 3: ...ned on the Tray place a bead of Bathroom Sealant not supplied the width of the Wall Profile along the tiled wall Screw the Wall Profile to the wall with 40mm Screws supplied Do not over tighten the screws into the Wall Profiles as this will misshape the Wall Profile Ensure the Wall Profile stays completely vertical throughout this procedure using a Spirit Level Failure to carry out this procedure ...

Страница 4: ...ting block is resting on top of the tray 4 Decide whether the door will open inwards or outwards and slide the Frame Magnet into the channel on the Vertical Frame and offer it over the shorter Wall Profile Note The image above shows the outward opening magnet configuration 5 Open the door slightly and push the Door Magnet onto the Door Glass at the handle side NOTE 2 people will be required to car...

Страница 5: ...al Ensure the door is completely vertical the bubble on the Spirit Level must be in the centre of the 2 lines 3 Fasten the Door to the Wall Profiles using the 9mm screws supplied 4 Seal the Wall Profiles vertically top to bottom both internally and externally where they meet the tiles IMPORTANT Failure to carry out stage 4 may result in serious water damage and is not covered under the terms of th...

Страница 6: ...ical Frame at the closing side of the door 7 Remove the release paper from the back of the adhesive tape which is on the underside of the Bottom Rail and place the Rail inside the Dam and Bottom Rail Joiner The Bottom Rail Joiner will need lifting slightly to allow positioning of the Bottom Rail 8 Press the Rail down onto the top of the tray ensuring that it is kept parallel to the outside edge of...

Страница 7: ...he door and frame locate onto each other down the full length of the door If the Seal drags over the Bottom Rail the door may need raising at the magnet side Unscrew the top 3 4 door fixing screws raise the door re drill and re fix 3 Remove the release paper from the Adhesive Tape supplied and place the Tape on the face of the Vertical Door Frame ensuring the Tape is positioned to one side of the ...

Страница 8: ...nd 1 24 Bottom Rail Adhesive Tape 1 5 Screw Cover Magnet Side 1 15 Pivot Cap Left Hand 1 25 Bottom Rail 1 6 Frame Magnet 1 16 Vertical Frame Pivot Side 1 26 Tube Cap Right Hand 1 7 Door Magnet 1 17 Long Wall Profile 1 27 Dam Right Hand 1 8 Door Assembly 1 18 Handle Assembly 1 28 Pivot Cap Right Hand 1 9 Tube Cap Left Hand 1 19 RH Top Cap Magnet Side 1 29 10 Screw Cover Pivot Side 1 20 Setting Bloc...

Страница 9: ...ring installation please refer to the Trouble Shooting Guide or contact Customer Relations on 44 0 1325 328033 To enable customer relations to provide you with an excellent level of service it is important that you quote your product Code and Reference Number these can be found on the Guarantee card Problem Solution Leaking 1 Check that the inside gap between the Tray and Wall Profiles has been se...