Page
6
of
14
Zipscreen Installation Manual | v4.2| August 2019
2019 ©Copyright All Rights Reserved Rollease Acmeda
STEP 3
–
ADD ADDITIONAL PRE-TURNS REQUIRED
Note: Gradually increase the number of pre-turns required. Only remove the pre-tension spanner when the spring tension is held by the internal
mechanism, immediately after a ‘click’ is heard.
STEP 4
–
UNLOCK PRE-TENSION HEAD
STEP 5
–
RE-INSTALL AND TEST BLIND
Note: When the weight bar is pulled down, the tension in
the spring will be released.
If too many pre-turns are added, the blind will automatically raise.
Note: Re-install and secure Retainer Clip when complete.
PART I
–
SIDE GUIDE INSTALLATION
STEP 1
–
MARK OUT SIDE GUIDE POSITION AND ALIGN RAIL (FOR OPEN BRACKET ONLY)
Note: Use Open Bracket Template (RE01-
Use thickness of Open Bracket Template
Rail to sit flush to bracket
3012-033000) to assist