3-101
Select [I/S MENU] > [I/S CONTROL] > [HEAD UP/DOWN]
> [MIDDLE], and press the [ENTER] key. The Capping Unit
moves down and the Head Carriage moves to the Middle po-
sition.
I/S MENU
I/S CONTROL
I/S CONTROL
HEAD UP/DOWN
[ ]
SERVICE MENU
I/S MENU
[ ]
[ ]
HEAD UP/DOWN
MIDDLE
[ ]
Turn on the Sub Power while pressing the Left, Right and
Down keys to enter the Service mode.
MENU
SERVICE MENU
+
MENU
Turn off the Sub Power SW and Main Power SW.
Main Power SW
< Rear side >
Sub Power SW
Move the Head Carriage to the right edge of the bed. And
check that the space between the UV Lamp and bed is 7mm
to 7.5mm.
If the space between the UV Lamp and bed is not 7mm to
7.5mm, go back to the step 29 and fi x the UV Lamp again.
Enter the Service Mode and perform the following check.
1. [4-13 UV LAMP CHECK]
7mm
~
7.5mm
34
35
36
37
Содержание VersaUV LEJ-640
Страница 32: ...2 4 MAIN BOARD_Arrangement Diagram Soldering Side ...
Страница 42: ...2 14 2 3 HEAD BOARD HEAD BOARD_Arrangement Diagram Component Side It indicates the version of the Board ...
Страница 43: ...2 15 HEAD BOARD_Arrangement Diagram Soldering Side ...
Страница 53: ...2 25 2 4 SERVO BOARD SERVO BOARD_Arrangement Diagram Component Side It indicates the version of the Board ...
Страница 54: ...2 26 SERVO BOARD_Arrangement Diagram Soldering Side ...
Страница 59: ...2 31 2 5 SUB BOARD SUB BOARD A_Arrangement Diagram Component Side It indicates the version of the Board ...
Страница 63: ...2 35 SUB BOARD B_ Arrangement Diagram Component Side ...
Страница 70: ...2 42 2 6 INK SYSTEM BOARD INK SYSTEM_Arrangement Diagram Component Side ...
Страница 72: ...2 44 2 7 TAKEUP BOARD TAKEUP BOARD_Arrangement Diagram Component Side It indicates the version of the Board ...
Страница 282: ...4 74 9 Fix the I S Cover I S Cover Hook Screw Screw ...
Страница 306: ...7 2 Unpacking ...