26
2.Installation
1. Assembly
B
Use bolts to secure the machine to the stand.
Tighten
fully
Bolts: 4
Step 3: Installing the Roll Holders
Procedure
A
Attach the roll holder supports to the vertical stands.
1
Check the positions to secure the roll holder supports and temporarily tighten the
bolts in the three locations on the left and right.
2
Fully tighten all the temporarily tightened bolts.
Tighten
fully
Bolts: 6
Содержание Camm-1 GR2-540
Страница 16: ...14...
Страница 22: ...20...
Страница 37: ...35 3 Appendix 3 Appendix Location of the Power Rating and Serial Number Label 36 Specifications 37...