![Rohde & Schwarz DDF205 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/rohde-and-schwarz/ddf205/ddf205_getting-started_1477685006.webp)
Preparation for Use
R&S
®
DDF205
6
Getting Started 4073.0187.02 ─ 03
Setup
Before turning on the R&S
DDF205, please make sure that the following con-
ditions are fulfilled:
●
Covers are in place and all fasteners are tightened.
●
Fan openings are unobstructed.
●
Signal levels at the input connectors are all within the specified ranges.
●
Signal outputs are correctly connected and not overloaded.
●
The R&S
DDF205 is dry and shows no condensation.
Non-observance may cause damage to the R&S
DDF205 or other devices in
the setup.
The R&S
DDF205 is supplied completely assembled except for the handles and
mounting brackets, which must be attached by the user.
1.2
Setup
1.2.1
Bench Operation
Equipment cooling
Do not expose the R&S
DDF205 to humidity. Leave at least 50 mm of empty
space along both side panels in order to ensure proper equipment cooling.
There are no special requirements for desktop use. To facilitate access to the front
panel elements, you should raise the front of the R&S
DDF205 by folding out its
standing feet.
Setup
Содержание DDF205
Страница 12: ...Preparation for Use R S DDF205 12 Getting Started 4073 0187 02 03 Setup...
Страница 46: ...Operation R S DDF205 46 Getting Started 4073 0187 02 03 Options for the R S DDF205...
Страница 72: ...Software and Firmware Update R S DDF205 72 Getting Started 4073 0187 02 03 Changing the IP Address...