40
Rockwell Automation Publication 750-TG101A-EN-P - June 2022
Chapter 4 Frames 1…5 Renewal Kits Installation
2. For all covers, apply the product label to the indentation on the cover.
3. Install the power terminal cover in the reverse order of removal.
IP54, NEMA/UL Type 12
Cover Replacement, Frames
2…5
Replacement kit catalog numbers: SK-RT-CVR12-F2, SK-RT-CVR12-F2-XT,
SK-RT-CVR12-F3, SK-RT-CVR12-F3-XT, SK-RT-CVR12-F4,
SK-RT-CVR12-F4-XT, SK-RT-CVR12-F5, SK-RT-CVR12-F5-XT
Remove the IP54, NEMA/UL Type 12 Cover, Frames 2…5
Follow theses steps to remove the cover.
1. Review the
.
2. Turn off and lock-out incoming power. See
.
Remove the IP54, NEMA/UL Type 12 Cover,
.
4. If present, remove any stored PE jumper retainer screws from the PE
retainer on the inside of the cover.
Frame 4 - Type 1 Cover Shown
Содержание 20G2
Страница 8: ...8 Rockwell Automation Publication 750 TG101A EN P June 2022 Notes ...
Страница 126: ...126 Rockwell Automation Publication 750 TG101A EN P June 2022 Chapter 5 Frame 6 Renewal Kits Installation Notes ...
Страница 194: ...194 Rockwell Automation Publication 750 TG101A EN P June 2022 Index Notes ...