21
R9V
Turn the paddle of both groups (
5-6
) to release
a cup of hot water from the group - first time
use only. Close the hot water by returning the
paddle to the start position
Open the steam handle (
7-8
) for some
seconds and then close it. Hot steam is dis-
pensed from the steam wand.
Caution!
This operation avoids milk re-
suction into the boiler. Wait till
the working pressure has been
reached again.
Your machine is now ready to work.
MACHINE
UNDER
MAINTENANCE
i
9
fig_5.2
5.1 Digital display glossary
Screen
1
(
fig._
5.3 - 5.4 - 5.5
)
1
.
1 cup symbol
2
.
2 cups symbol
3
.
Rocket symbol: press to move between
screens
4
.
Hot water symbol: press to switch
between on/off
5
.
symbol indicates the coffee boiler is
heating
6
.
symbol indicates the coffee boiler is
not heating
NB
. It is normal for the machine to switch
between
and
symbols. Machine
temperature is always indicated above this
symbol.
7
.
symbols indicates
the selected pressure profile being used.
8
.
symbol indicates manual mode
9
.
symbol recalls last saved manual
profile
2
7
4
1
5
3
6
8
fig_5.3
fig_5.4
9
fig_5.5
Содержание R9V Series
Страница 1: ...R9V EN PROFESSIONAL COFFEE MACHINE Use and maintenance manual Original instructions...
Страница 2: ......
Страница 38: ...R9V Note...
Страница 39: ......